Skip to main content

VIDEO: Pittsburgh says goodbye to 108-year-old Hulton Bridge

January 27, 2016
It took 500 explosive charges to bring down a 108-year-old truss bridge in the US city of Pittsburgh and crews had three days to clear up the debris, according to local news stations.

The blasts dropped the spans of 407m-long Jonathon Hulton Bridge directly into the Allegheny River. It was the first major bridge designed by Allegheny County in the state of Pennsylvania and connected the eastern Pittsburgh city suburbs of Oakmont and Harmarville.

A new steel girder bridge, directly beside it, opened to traffic in October. It has four 3.35m-wide vehicle lanes - two in each direction – and a 1.23m wide median. There are 1.8m shoulders on each side of the road and a sidewalk on the downstream side of the bridge.

Design of the new bridge was by 5412 Gannett Fleming and the contractor was Brayman Construction. Construction management and inspection was by SAI Consulting Engineers and CDR Maguire.

For more information on companies in this article

Related Content

  • JCCBI says US$300m for demolishing Montreal’s old Champlain Bridge
    April 11, 2017
    Tearing down the old steel truss cantilever Champlain Bridge in Montreal could cost around US$300 million, according to preliminary estimates by a federal government agency. Also, until the nearby new Champlain Bridge is finished, it will cost US$93 million annually to maintain the old one, according to Jacques Cartier and Champlain Bridges Incorporated (JCCBI), the federal Canadian agency that oversees several major road infrastructure assets in the city. Dismantling will start in 2019 at the earliest and
  • Auckland’s future strategic transport requirements
    July 5, 2012
    The Auckland Harbour Bridge is at the stage that it cannot cope with much more traffic, yet the population of the Auckland region continues to grow at a steady rate. Coupled with that, the bridge is a key link in the most important transport corridor in the country, State Highway One. Without it, the country would struggle to function. Not only home to New Zealand's largest city and one third of its population, Auckland's port is one of the country's largest. Some 140m north of the city is Marsden Point, th
  • Highway 407 Revisited – smart tollroad extension
    June 7, 2016
    In the late 1990s, World Highways published a supplement on construction of Canada’s Highway 407, the world’s first all-electronic toll road. But how successful has it been? David Arminas reports from Toronto The head office for 407 ETR Concession Company is a low-rise building next to exit 59, just north of Toronto, Canada’s economic powerhouse. The building may be non-descript but inside is the advanced technical heart of Highway 407 ETR – Express Toll Route. It houses the latest toll monitoring techno
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of