Skip to main content

VIDEO: People see red over white elephant of a blue bike lane

November 1, 2016
The Scottish roads authority has backpedalled on its recently improved cycle lane along a major route on the south-west coast, close to the city of Ayr.

Amid local authority concerns over traffic congestion and one man’s media-grabbing protest, the cycle lane will now be ripped out – after being installed this summer.

As the video shows, it is a protected wide lane, often painted blue. Cars appear to travel freely beside it.

But residents, city folks and local government councillors decided it was %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal one cycle lane too many Visit www.ayradvertiser.com website false http://www.ayradvertiser.com/news/14786829.The_Holmston_Road_cycle_lane_will_be_RIPPED_UP/ false false%>. Consultation with the public has meant the lane will be wiped out, as reported by the local newspaper Ayradvertiser.

On man, a 63-year-old retired engineer, decided %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal to protest Visit www.dailyrecord.co.uk website false http://www.dailyrecord.co.uk/news/local-news/watch-ayr-mans-bizarre-rowing-8900855 false false%> by setting up a rowing machine in the middle of the €67,000 bike lane to show it is little used.

Scottish government figures show there are around 3,815km of National Cycle Network routes. Just over 1,000km are traffic-free routes which use a mix of railway path, canal towpath, forest road, shared-use path, segregated cycle lanes and redetermined rural footways. The remainder of the network is on road and, where possible, it incorporates lightly-used rural roads or quiet urban streets.

Related Content

  • Manitou will launch three revised MT telehandlers with lift heights of 8-30m
    February 8, 2013
    Though keeping exact specification under wraps until the show, Manitou will unveil the first three models in a revised MT line-up of telescopic handlers. The Stage IIIB machines will offer lift heights of 8-30m, and will focus on ease of use for the operator.
  • Innovative road construction demonstration planned
    June 20, 2017
    A demonstration of innovative, sustainable road construction technologies is planned in France. The ERA-NET Plus Infravation has selected the BioRePavation project as part of its European and American transport infrastructure innovation programme.
  • PPRS Nice 2018: Time running out for Early-bird rates!
    December 11, 2017
    This Friday is the last chance to benefit from early registration rates for PPRS Nice 2018 – the Pavement Preservation and Recycling Summit – in March. Early-bird rates will be available until midnight on December 15.
  • Sandvik is now using Volvo Penta engines in its underground trucks and loaders
    January 6, 2017
    Sandvik Mining is now using Volvo Penta engines in its underground trucks and loaders. The advanced engines meet Tier 4 Interim/Stage IIIB emission standards and are claimed to reduce fuel and ventilation costs in comparison with other units. The Volvo Penta engineers designed a selective catalytic reduction (SCR) unit in the exhaust system that converts NOx gas into nitrogen and water. The Volvo Penta exhaust-treatment solution also reduces DPM levels without the need for a diesel particulate filter (DPF).