Skip to main content

VIDEO: Nexus picks up Toowoomba bypass project in Queensland, Australia

August 21, 2015
Nexus Infrastructure group has signed a contract with the Australian government to deliver the Toowoomba Second Range Crossing project in Queensland state, costing nearly US$1.2 billion.

Nexus will design construct, finance, operate and maintain the 41km route that will bypass the city of Toowoomba, east to west.

Toowomba and district, with a population of around 158,000, is inland 125km west of Queensland's capital city Brisbane, on Australia’s northeast coast.

The route will also be another highway crossing the Great Dividing Range, or the Eastern Highlands. It is Australia's most substantial mountain range, stretching more than 3,500km from north to south along the eastern side of the continent.

Nexus Infrastructure consists of financial advisory and investor Plenary Group, investors 930 Cintra and 976 Acciona Concessions, as well as the construction joint venture of Acciona Infrastructure and 2717 Ferrovial Agroman, and finally 1304 Transfield Services as the project’s operations and maintenance provider.

The Australian Government has committed nearly $952 million to fund the project and the Queensland Government has committed $235 million.

According to the Queensland government, the contract is an availability-based public private partnership. Using this model, Queensland will provide upfront government funding contributions during the construction stage of the project and ongoing service payments over the 25 year operation and maintenance stage, which will be dependent on performance.

Construction is expected to be complete in late 2018, after which Nexus is contracted to operate and maintain the road for 25 years, according to a statement from Nexus.

Key features of Nexus' proposed design solution include:

  • Four lanes from Warrego Highway east interchange to Warrego Highway west;
  • Grade separated interchanges at Warrego Highway West, Toowoomba-Cecil Plains Road and Gore Highway;
  • A grade separated connection to Mort Street;
  • A cutting around 30m deep at the top of the Toowoomba Range will be constructed as an alternative to the tunnel solution detailed in the reference design; this will allow all heavy vehicles, including dangerous goods and over-dimensional, to use the Toowoomba Second Range Crossing;
  • An 800m viaduct built over the existing Queensland Rail line;
  • Continuity of the New England Highway through a new bridge over the cutting.
Nexus Infrastructure chairman, John Witheriff said the consortium’s successful bid included a commitment to support local employment and the local supply chain. “Major infrastructure projects of this size are unique, city changing investments, creating significant economic and community outcomes. Nexus is committed to working with local businesses and residents to achieve lasting outcomes.”

Nexus said it is aiming for around 76% local involvement through procurement right from the procurement stage through to the operation and maintenance period.

Up to 1,800 full-time jobs are likely during the construction and maintenance of the project that should divert almost 80% of heavy and super-heavy commercial vehicles away from the existing range crossing. It should also reduce their driving time past Toowoomba by 40 minutes, not least because drivers will avoid 18 sets of traffic lights on the existing route directly through town.

For more information on companies in this article

Related Content

  • Road projects for Queensland, Australia
    May 6, 2016
    Major highway improvement works are being proposed for Queensland, Australia. The aim of the work will be to reduce congestion along a 4km stretch of highway that suffers long delays during peak periods at present. Some US$129.5 million (A$168 million) of federal funding will has been proposed to widen the highway connecting the Gold Coast with Queensland capital Brisbane, with work possibly starting in 2017. However the project hangs in the balance and depends on the results of an upcoming election process
  • Major Canadian toll road extension project awarded
    May 25, 2012
    A joint venture formed by SNC Lavalin and Cintra Infrastructure will handle the contract to extend Highway 407 in Canada. This US$974.4 million (C$1 billion) deal was awarded by the authorities in Ontario to a joint-venture called the 407 East Development Group General Partnership and is a partnership between Spanish firm Cintra (a subsidiary of Ferrovial) and Canadian company SNC-Lavalin of Canada. The partnership will build, design and maintain Phase 1 of the new Highway 407 East. The construction work is
  • Australia bites the bullet on roads reform
    August 2, 2012
    Predictions of impending doom for Australia's roads infrastructure have given the nation's governments and roads stakeholders the fright they needed to collaborate on roads policy. If the latest initiatives Australia is putting in place do produce the full extent of the roads reform required, there will be some lessons there for the whole world Whether through pride or stubbornness, or a combination of both, each state and territory of Australia has always liked to do things its own way. To some extent and
  • Australian highway works in Queensland and NSW
    June 3, 2022
    Highway works in Australia’s Queensland and NSW states.