Skip to main content

VIDEO: Nexus picks up Toowoomba bypass project in Queensland, Australia

August 21, 2015
Nexus Infrastructure group has signed a contract with the Australian government to deliver the Toowoomba Second Range Crossing project in Queensland state, costing nearly US$1.2 billion.

Nexus will design construct, finance, operate and maintain the 41km route that will bypass the city of Toowoomba, east to west.

Toowomba and district, with a population of around 158,000, is inland 125km west of Queensland's capital city Brisbane, on Australia’s northeast coast.

The route will also be another highway crossing the Great Dividing Range, or the Eastern Highlands. It is Australia's most substantial mountain range, stretching more than 3,500km from north to south along the eastern side of the continent.

Nexus Infrastructure consists of financial advisory and investor Plenary Group, investors 930 Cintra and 976 Acciona Concessions, as well as the construction joint venture of Acciona Infrastructure and 2717 Ferrovial Agroman, and finally 1304 Transfield Services as the project’s operations and maintenance provider.

The Australian Government has committed nearly $952 million to fund the project and the Queensland Government has committed $235 million.

According to the Queensland government, the contract is an availability-based public private partnership. Using this model, Queensland will provide upfront government funding contributions during the construction stage of the project and ongoing service payments over the 25 year operation and maintenance stage, which will be dependent on performance.

Construction is expected to be complete in late 2018, after which Nexus is contracted to operate and maintain the road for 25 years, according to a statement from Nexus.

Key features of Nexus' proposed design solution include:

  • Four lanes from Warrego Highway east interchange to Warrego Highway west;
  • Grade separated interchanges at Warrego Highway West, Toowoomba-Cecil Plains Road and Gore Highway;
  • A grade separated connection to Mort Street;
  • A cutting around 30m deep at the top of the Toowoomba Range will be constructed as an alternative to the tunnel solution detailed in the reference design; this will allow all heavy vehicles, including dangerous goods and over-dimensional, to use the Toowoomba Second Range Crossing;
  • An 800m viaduct built over the existing Queensland Rail line;
  • Continuity of the New England Highway through a new bridge over the cutting.
Nexus Infrastructure chairman, John Witheriff said the consortium’s successful bid included a commitment to support local employment and the local supply chain. “Major infrastructure projects of this size are unique, city changing investments, creating significant economic and community outcomes. Nexus is committed to working with local businesses and residents to achieve lasting outcomes.”

Nexus said it is aiming for around 76% local involvement through procurement right from the procurement stage through to the operation and maintenance period.

Up to 1,800 full-time jobs are likely during the construction and maintenance of the project that should divert almost 80% of heavy and super-heavy commercial vehicles away from the existing range crossing. It should also reduce their driving time past Toowoomba by 40 minutes, not least because drivers will avoid 18 sets of traffic lights on the existing route directly through town.

For more information on companies in this article

Related Content

  • New South Wales is seeking financial packers for WestConnex in Sydney
    June 19, 2015
    Investment bank Goldman Sachs will soon be sending out expressions of interest for backers to finance Australia’s biggest road deal, the three-stage WestConnex project to be rollout by the New South Wales government. According to a report by The Australian newspaper, initially around US$1.17 billion will be needed for the first phase of the Sydney toll road project. The first phase will likely cost between nearly $2.35 billion and $3.9 billion. Total cost of all three phases over 10 years could be as
  • Brisbane's highway of distinction
    August 2, 2012
    A massive AU$2 billion update of the Gateway Motorway in Queensland is underway to improve an infrastructure stretched by population boom. Report and photographs by Adrian Greeman Just 20 years after the Australian city of Brisbane built its Gateway Motorway with a high slim signature bridge dominating the river skyline, the road is being completely revamped. Some 12km of urban route on the south of the Brisbane River is being expanded to take much increased traffic levels; the north is getting a completely
  • Spanish highway project to get EIB A-rated bond issue?
    April 20, 2012
    The European Investment Bank (EIB) is reported to be in talks with the sponsors of the A-66 Benavente-Zamora highway public private partnership (PPP) in Spain over a possible bond financing deal, which would see the Bank provide subordinated debt for an A-rated bond issue. The possible bond issue would be a further greenfield project to launch the European Union’s Project Bond 2020 initiative, with its initial pilot stage being managed by the EIB.
  • Balfour Beatty Mott McDonald secure key H Agency contract
    June 15, 2012
    The Highways Agency has awarded the second of its new Asset Support Contracts to Balfour Beatty Mott MacDonald. The contract involves maintaining and improving the network of motorways and major ‘A’ roads in the North West. It will cover the Agency’s roads in Cheshire, Greater Manchester, Merseyside and south Lancashire and will go live from November 2012. Cumbria and the remainder of Lancashire are covered by a separate contract. The key contract will ensure motorways and major 'A' roads in the region co