Skip to main content

VIDEO: M6 motorway link taking shape between Knutsford and Bowdon

August 23, 2016
In the UK, work to connect sections of the new €223 million A556 Knutsford to Bowdon dual carriageway, between the M6 and M56 in Cheshire, will get underway in earnest at the weekend with the opening of its first bridge.

The route of the road, forming a link between junction 19 of the M6 motorway at Knutsford and junction 7 of the M56 motorway at Bowdon, has been taking shape for some time.
 
However, the need to keep open existing roads which cross the route of the new dual carriageway while it is being built means it has yet to be connected from end to end. Work to move these roads onto bridges over the new road is now underway.
 
The A50 from Mere, Chapel Lane from Bucklow Hill and Millington Lane – all with junctions along the existing A556 – are all currently running across the path of the new A556 with the route of the new road being excavated on either side of them.

Each of the roads will be realigned and moved onto newly-built bridges crossing the new dual carriageway - with the A50 work due for completion by 30 August. By then, all traffic heading between High Legh and Mere crossroads will have started using the new A50 bridge.

Work to run traffic over the new bridges at Chapel Lane and Millington Lane – as well as a new bridge providing farm access at Bentleyhurst Lane – will be done over the next few months.

From the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal drone&#8217;s eye view View the YouTube Video false https://www.youtube.com/watch?v=52j1OtBWolE false false%>, the project stretches well into the distance.

Related Content

  • Perlini Equipment for dump trucks
    April 8, 2013
    Perlini Equipment is one of the world's leading manufacturers of dump trucks – having sold over 12,000 of them worldwide since 1957. The firm currently offers machines up to a capacity of 95tonnes. Reliable and easy to drive, and with customised models available on request, the trucks are built with high quality Perlini original components, offering top-tier performance and fuel efficiency.
  • Far from formulaic
    January 6, 2017
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • Far from formulaic
    January 17, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • The European Union Road Federation (ERF) calls for EU Member States to prioritise road maintenance
    June 26, 2014
    The European Union Road Federation (ERF) has put out an “urgent” call for “EU Member States to prioritise road maintenance” as neglected surfaces continue to deteriorate and the potholes grow larger and larger. ERF wants the EU to “put alternative financing mechanisms into place” as soon as possible, to tackle what it sees as a growing road safety crisis across the region. At its first ERF biennial Symposium on Road Infrastructure Challenges in June, more than 100 stakeholders heard the ERF demand the “ope