Skip to main content

VIDEO: M6 motorway link taking shape between Knutsford and Bowdon

August 23, 2016
In the UK, work to connect sections of the new €223 million A556 Knutsford to Bowdon dual carriageway, between the M6 and M56 in Cheshire, will get underway in earnest at the weekend with the opening of its first bridge.

The route of the road, forming a link between junction 19 of the M6 motorway at Knutsford and junction 7 of the M56 motorway at Bowdon, has been taking shape for some time.
 
However, the need to keep open existing roads which cross the route of the new dual carriageway while it is being built means it has yet to be connected from end to end. Work to move these roads onto bridges over the new road is now underway.
 
The A50 from Mere, Chapel Lane from Bucklow Hill and Millington Lane – all with junctions along the existing A556 – are all currently running across the path of the new A556 with the route of the new road being excavated on either side of them.

Each of the roads will be realigned and moved onto newly-built bridges crossing the new dual carriageway - with the A50 work due for completion by 30 August. By then, all traffic heading between High Legh and Mere crossroads will have started using the new A50 bridge.

Work to run traffic over the new bridges at Chapel Lane and Millington Lane – as well as a new bridge providing farm access at Bentleyhurst Lane – will be done over the next few months.

From the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal drone&#8217;s eye view View the YouTube Video false https://www.youtube.com/watch?v=52j1OtBWolE false false%>, the project stretches well into the distance.

Related Content

  • Sennebogen shows dragline at INTERMAT
    January 6, 2017
    While draglines are now a rarity, Sennebogen showed its 50tonne operating weight duty cycle crawler crane, the 650HD, with 2.33 dragline bucket. The machine is one of a 10-model range with operating weights from 20-180tonnes and engines between 119 and 708kW. It can be used in civil engineering, mining, demolition or material handling.
  • Sennebogen shows dragline at INTERMAT
    April 19, 2012
    While draglines are now a rarity, Sennebogen showed its 50tonne operating weight duty cycle crawler crane, the 650HD, with 2.33 dragline bucket. The machine is one of a 10-model range with operating weights from 20-180tonnes and engines between 119 and 708kW. It can be used in civil engineering, mining, demolition or material handling.
  • VIDEO: Get me to the church on time, and fast
    November 12, 2015
    God willing, two nuns in northern Slovakia caught on camera speeding managed to get home, or to the church, safely and on time. The sister, accompanied by another nun, was pushing her Skoda Fabia with religious conviction to around 160kph, or 100mph. However, they haven’t been the fastest nuns around Europe in recent years. In 2009, a nun in Italy, near Turin, was stopped by police for nudging upwards of 180kph – 110mph. The UK’s Daily Mail newspaper reported at the time that “demon driver Sister T
  • BLS Enterprises is offering new milling machine trackpads
    January 6, 2017
    Component specialist BLS Enterprises is offering a durable replacement track pad for use on Wirtgen milling machines. President Barry Stoughton said, “We have a direct replacement for the EPS system.” He said that this two part pad system allows the pad to bolt directly onto the track. Long life and durability are claimed, as well as ease of replacement.