Skip to main content

VIDEO: M6 motorway link taking shape between Knutsford and Bowdon

August 23, 2016
In the UK, work to connect sections of the new €223 million A556 Knutsford to Bowdon dual carriageway, between the M6 and M56 in Cheshire, will get underway in earnest at the weekend with the opening of its first bridge.

The route of the road, forming a link between junction 19 of the M6 motorway at Knutsford and junction 7 of the M56 motorway at Bowdon, has been taking shape for some time.
 
However, the need to keep open existing roads which cross the route of the new dual carriageway while it is being built means it has yet to be connected from end to end. Work to move these roads onto bridges over the new road is now underway.
 
The A50 from Mere, Chapel Lane from Bucklow Hill and Millington Lane – all with junctions along the existing A556 – are all currently running across the path of the new A556 with the route of the new road being excavated on either side of them.

Each of the roads will be realigned and moved onto newly-built bridges crossing the new dual carriageway - with the A50 work due for completion by 30 August. By then, all traffic heading between High Legh and Mere crossroads will have started using the new A50 bridge.

Work to run traffic over the new bridges at Chapel Lane and Millington Lane – as well as a new bridge providing farm access at Bentleyhurst Lane – will be done over the next few months.

From the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal drone&#8217;s eye view View the YouTube Video false https://www.youtube.com/watch?v=52j1OtBWolE false false%>, the project stretches well into the distance.

Related Content

  • Rapid International unveils new-look corporate logo
    January 6, 2017
    Rapid International is officially uneviling its new look corporate branding at bauma. An important step forward, the company says the new logo refines and modernises the existing logo mark, and reflects both the history and the future of the company at a symbolic time for the organisation, as it welcomes the arrival of the next generation. John Pickering, son of Rapid's late founding partner Mr Bertie Pickering, joined the company recently as export sales manager.
  • Rapid International unveils new-look corporate logo
    April 5, 2013
    Rapid International is officially uneviling its new look corporate branding at bauma. An important step forward, the company says the new logo refines and modernises the existing logo mark, and reflects both the history and the future of the company at a symbolic time for the organisation, as it welcomes the arrival of the next generation. John Pickering, son of Rapid's late founding partner Mr Bertie Pickering, joined the company recently as export sales manager.
  • Start of Torrens section upgrade of Adelaide’s North-South Corridor
    August 12, 2015
    Work is underway in the Australian city of Adelaide on a US$657 million upgrade of the Torrens Road to River Torrens section of the North-South Corridor. Nearly 500 workers will eventually be on site to upgrade the 3.7km section of road, of which 3km will be made into a non-stop roadway. The project includes a 2km section of non-stop lowered motorway as well as an overpass for the city’s Outer Harbour rail line. Contractors will deliver six intersection upgrades as well as improved cycling and pedestr
  • Seoul, city of contemplation and the 25th World Road Congress
    March 18, 2015
    It’s been a decade since South Korea’s capital city Seoul took the bold step of replacing a major urban throughway with a park, complete with a river, to create the Cheonggyecheon Walkway. Now, Seoul is getting ready to host the 25th World Road Congress from November 2-5. The event is being produced in cooperation with the Ministry of Land, Infrastructure and Transport of the Republic of Korea, the Korea Expressway Corporation, the Korea Road & Transportation Association and the PIARC Korean National Commit