Skip to main content

VIDEO: M6 motorway link taking shape between Knutsford and Bowdon

August 23, 2016
In the UK, work to connect sections of the new €223 million A556 Knutsford to Bowdon dual carriageway, between the M6 and M56 in Cheshire, will get underway in earnest at the weekend with the opening of its first bridge.

The route of the road, forming a link between junction 19 of the M6 motorway at Knutsford and junction 7 of the M56 motorway at Bowdon, has been taking shape for some time.
 
However, the need to keep open existing roads which cross the route of the new dual carriageway while it is being built means it has yet to be connected from end to end. Work to move these roads onto bridges over the new road is now underway.
 
The A50 from Mere, Chapel Lane from Bucklow Hill and Millington Lane – all with junctions along the existing A556 – are all currently running across the path of the new A556 with the route of the new road being excavated on either side of them.

Each of the roads will be realigned and moved onto newly-built bridges crossing the new dual carriageway - with the A50 work due for completion by 30 August. By then, all traffic heading between High Legh and Mere crossroads will have started using the new A50 bridge.

Work to run traffic over the new bridges at Chapel Lane and Millington Lane – as well as a new bridge providing farm access at Bentleyhurst Lane – will be done over the next few months.

From the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal drone&#8217;s eye view View the YouTube Video false https://www.youtube.com/watch?v=52j1OtBWolE false false%>, the project stretches well into the distance.

Related Content

  • VIDEO: Brazilian cyclists caught on camera drafting a truck
    January 18, 2016
    Just how dangerous is it for a cyclist to draft a fast moving vehicle? Probably very dangerous but that means only some cyclists will attempt it, as these videos shows. At the start of this video from Brazil, the cyclist on the right appears to attach his Go Pro camera to the rear of the truck that they are drafting. It is not until about 3:55 seconds into the video that the speed picks up and reaches reportedly 124kph. Near the end of the video, the one cyclist left appears to take back the camera off t
  • VIDEO: Brazilian cyclists caught on camera drafting a truck
    January 18, 2016
    Just how dangerous is it for a cyclist to draft a fast moving vehicle? Probably very dangerous but that means only some cyclists will attempt it, as these videos shows. At the start of this video from Brazil, the cyclist on the right appears to attach his Go Pro camera to the rear of the truck that they are drafting. It is not until about 3:55 seconds into the video that the speed picks up and reaches reportedly 124kph. Near the end of the video, the one cyclist left appears to take back the camera off t
  • Sandvik’s new Prisec: one crusher, two configurations
    February 13, 2013
    The new generation of compact horizontal impact crushers (HSI) from Sandvik Construction is said to provide a low capital cost solution, optimum performance and good cubical shape. The all-new patented and highly modularised Sandvik CI5 Prisec crusher range combines the ability to configure one base crusher into either a primary or a secondary configuration, making it adaptable to ever-changing requirements. The company says the crushers have been developed in response to customer demands, and they are spea
  • Replace bridge for Vancouver’s Massey Tunnel could aid congestion
    December 21, 2015
    Opponents of a proposed 10-lane bridge near Vancouver, Canada, said the structure will encourage urban sprawl in a region that is already struggling with a booming population. The British Columbia provincial government recently opened the final round of public consultation for the planned 3.3km toll bridge likely to cost around US$2.54 billion.