Skip to main content

VIDEO: M6 motorway link taking shape between Knutsford and Bowdon

August 23, 2016
In the UK, work to connect sections of the new €223 million A556 Knutsford to Bowdon dual carriageway, between the M6 and M56 in Cheshire, will get underway in earnest at the weekend with the opening of its first bridge.

The route of the road, forming a link between junction 19 of the M6 motorway at Knutsford and junction 7 of the M56 motorway at Bowdon, has been taking shape for some time.
 
However, the need to keep open existing roads which cross the route of the new dual carriageway while it is being built means it has yet to be connected from end to end. Work to move these roads onto bridges over the new road is now underway.
 
The A50 from Mere, Chapel Lane from Bucklow Hill and Millington Lane – all with junctions along the existing A556 – are all currently running across the path of the new A556 with the route of the new road being excavated on either side of them.

Each of the roads will be realigned and moved onto newly-built bridges crossing the new dual carriageway - with the A50 work due for completion by 30 August. By then, all traffic heading between High Legh and Mere crossroads will have started using the new A50 bridge.

Work to run traffic over the new bridges at Chapel Lane and Millington Lane – as well as a new bridge providing farm access at Bentleyhurst Lane – will be done over the next few months.

From the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal drone&#8217;s eye view View the YouTube Video false https://www.youtube.com/watch?v=52j1OtBWolE false false%>, the project stretches well into the distance.

Related Content

  • Lighter ESCO lip system offer 19% more useable wear metal
    January 6, 2017
    Wear parts specialist ESCO is using Bauma to show its new Nemisys lip system which has been engineered to deliver a lighter weight lip better sized and suited to modern buckets. The lip’s streamlined profile optimises production, says ESCO, and machine working cycles. A clever new hammerless tooth and shroud system helps reduce maintenance costs through improved reliability, faster and safer replacement, and improved lip coverage. The slim lip design and matching tooth system require 10% less force to penet
  • Lighter ESCO lip system offer 19% more useable wear metal
    February 15, 2013
    Wear parts specialist ESCO is using Bauma to show its new Nemisys lip system which has been engineered to deliver a lighter weight lip better sized and suited to modern buckets. The lip’s streamlined profile optimises production, says ESCO, and machine working cycles. A clever new hammerless tooth and shroud system helps reduce maintenance costs through improved reliability, faster and safer replacement, and improved lip coverage. The slim lip design and matching tooth system require 10% less force to penet
  • Lintec’s new Aggregate Cooling System given bauma platform
    February 12, 2013
    Lintec’s Aggregate Cooling System (ACS) is described as a new, patented and fully containerised plant concept for the direct cooling of aggregates for concrete mixes. Being showcased at bauma, ACS is said by Lintec to work in a desert environment without the usual and costly addition of specifically produced ice.
  • Sleipner’s highlights system for moving excavators
    February 13, 2013
    Sleipner will explain the principle behind its “revolutionary method to improve the overall productivity in open-pit mines, quarries and construction sites.” The improvement is based on moving excavators around the site much faster than before, and additionally the Sleipner method saves time and money and considerably increases the excavators’ life, says the company.