Skip to main content

VIDEO: London’s Silvertown Tunnel gets approval

October 13, 2016
A road tunnel costing €1 billion and a €111 million cycle and pedestrian bridge are among three infrastructure projects given the go-ahead by London’s mayor.

The Silvertown Tunnel and the cycle and pedestrian bridge will link the Canary Wharf area north of the River Thames with Rotherhithe on the south bank.

London mayor Sadiq Khan also approved an extension to the Docklands Light Railway that would run to Gallions Reach on the south bank of the Thames.

Two other crossing are under consultation, according to a local media reports. A ferry route would run between the Isle of Dogs and North Greenwich and a London Overground railway from Abbey Wood to Barking Riverside.

Business groups welcomed the news but there has been continuing opposition from environmental groups and local campaigners who claim that the routes would worsen air quality.

The twin-bore Silvertown Tunnel will be constructed just east of the Blackwall Tunnel that suffers from growing congestion. Silvertown is expected to be a toll road with discounts for local residents and be open by 2023. Construction of the design, build, finance and maintenance project could start in 2018-19. Construction could take just over four years followed by a 25-year concession.

Prequalification documents should be submitted to the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal procurement department of Transport for London (TfL A web link to submit the documents false https://tflsilvertown.bravosolution.co.uk/web/login.shtml false false%>) before the end of November.

Related Content

  • Vancouver’s 10-lane bridge replacement for Massey Tunnel remain undecided
    October 23, 2015
    Construction of a 10-lane bridge to replace a congested river tunnel in Vancouver, Canada, is still on target to start in 2017, despite details remaining sketchy.

    The bridge will replace the 60-year-old George Massey Tunnel between the local cities of Richmond and Delta along the provincial Highway 99. But the cost and – importantly – whether it will be a toll bridge have not been declared by the British Columbia provincial government.
  • Melbourne link: Hyder and Parsons Brinckerhoff to be design team
    October 22, 2014
    Hyder and Parsons Brinckerhoff have been appointed as the design team for the US$5.97 billion East West Link in Melbourne, Australia. The two engineering and management consultancies are in a 50/50 joint venture to provide detailed design and construction support services for the 6.6km Stage 1 work, which is the eastern section, of the project. Together with the proposed western section, the completed East West Link will cost around $7 billion. The toll road will form an 18km cross-city connection ext
  • Norway mulls new routes across the vast Hardangervidda plateau
    November 2, 2015
    Norway is considering proposals for another route across over the vast Hardangervidda, one of Europe’s largest plateaux and most of which is a national park. The Norwegian Road Administration (Statens Vegvesen) said one proposal would incorporate a 6km tunnel at a cost more than €216 million, according to a report the Nationen newspaper.
  • Third stage of Sydney’s WestConnex tunnel to be 1km longer
    December 4, 2014
    Changes to the third stage of the planned WestConnex motorway have been announced by Duncan Gay, Roads Minister of Australia’s New South Wales state. The motorway tunnel will be 8km, around 1km longer than initially announced under the US$9.7 billion WestConnex project of 33km of new roads around the city of Sydney. The changes are not likely to cost more, according to the NSW government. The third stage would cover the route between Haberfield and St. Peters and be constructed between 2018 and 2023.