Skip to main content

VIDEO: London’s Silvertown Tunnel gets approval

October 13, 2016
A road tunnel costing €1 billion and a €111 million cycle and pedestrian bridge are among three infrastructure projects given the go-ahead by London’s mayor.

The Silvertown Tunnel and the cycle and pedestrian bridge will link the Canary Wharf area north of the River Thames with Rotherhithe on the south bank.

London mayor Sadiq Khan also approved an extension to the Docklands Light Railway that would run to Gallions Reach on the south bank of the Thames.

Two other crossing are under consultation, according to a local media reports. A ferry route would run between the Isle of Dogs and North Greenwich and a London Overground railway from Abbey Wood to Barking Riverside.

Business groups welcomed the news but there has been continuing opposition from environmental groups and local campaigners who claim that the routes would worsen air quality.

The twin-bore Silvertown Tunnel will be constructed just east of the Blackwall Tunnel that suffers from growing congestion. Silvertown is expected to be a toll road with discounts for local residents and be open by 2023. Construction of the design, build, finance and maintenance project could start in 2018-19. Construction could take just over four years followed by a 25-year concession.

Prequalification documents should be submitted to the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal procurement department of Transport for London (TfL A web link to submit the documents false https://tflsilvertown.bravosolution.co.uk/web/login.shtml false false%>) before the end of November.

Related Content

  • NDT sensor fusion in structural pavement condition surveys
    February 27, 2017
    Early detection of pavement defects and the causes of deterioration is essential for effective maintenance planning, writes Dr Alena Uus* There is a need for optimisation and development of UK highway survey methods that would provide comprehensive information on the surface and subsurface pavement condition and operate at traffic speed, which eliminates the requirement for lane closures. Performance of non-destructive testing (NDT) methods commonly employed in pavement condition surveys can be potent
  • UK: Work starts on Mersey Gateway main bridge deck
    June 2, 2016
    Work has started on 2.2km Mersey Gateway’s main bridge deck as the project enters its third year of construction. The new six-lane toll bridge will link the English towns of Runcorn and Widnes and teams will begin to connect the steel support cables to the deck and upper pylons this summer. Trinity, the project’s movable scaffolding system (MSS), has cast the first 250m of the north approach viaduct and a new MSS is on its way to Halton to build the south approach viaduct. The local road network is al
  • E&E Event 2018 Berlin: an asphalt industry fit for purpose
    April 3, 2018
    Exhibition space is now sold out for the E&E Event 2018 – Euroasphalt & Eurobitume - coming to Berlin, June 14-15. But early registration for a discount is still available, however the deadline is fast approaching – April 16. The finalised programme will soon be published for the E&E Event 2018 that will focus on the preparations needed by the asphalt industry to ensure it is fit for purpose in the future.
  • Bentley Systems calls for submissions to 2016 Be Inspired Awards
    June 2, 2016
    Bentley Systems, a global provider of software solutions for advancing infrastructure, has announced a call for submissions to the 2016 Be Inspired Awards programme. The deadline for entries is June 10, 2016. The awards, which are selected by independent juries of industry experts, recognise the extraordinary work of organisations that help advance the world’s infrastructure by designing, engineering, constructing, delivering, and/or operating safer, more resilient, sustainable, and intelligent roads,