Skip to main content

VIDEO: London’s Silvertown Tunnel gets approval

October 13, 2016
A road tunnel costing €1 billion and a €111 million cycle and pedestrian bridge are among three infrastructure projects given the go-ahead by London’s mayor.

The Silvertown Tunnel and the cycle and pedestrian bridge will link the Canary Wharf area north of the River Thames with Rotherhithe on the south bank.

London mayor Sadiq Khan also approved an extension to the Docklands Light Railway that would run to Gallions Reach on the south bank of the Thames.

Two other crossing are under consultation, according to a local media reports. A ferry route would run between the Isle of Dogs and North Greenwich and a London Overground railway from Abbey Wood to Barking Riverside.

Business groups welcomed the news but there has been continuing opposition from environmental groups and local campaigners who claim that the routes would worsen air quality.

The twin-bore Silvertown Tunnel will be constructed just east of the Blackwall Tunnel that suffers from growing congestion. Silvertown is expected to be a toll road with discounts for local residents and be open by 2023. Construction of the design, build, finance and maintenance project could start in 2018-19. Construction could take just over four years followed by a 25-year concession.

Prequalification documents should be submitted to the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal procurement department of Transport for London (TfL A web link to submit the documents false https://tflsilvertown.bravosolution.co.uk/web/login.shtml false false%>) before the end of November.

Related Content

  • Sunderland’s sliding bridge slips across the Wear
    October 26, 2016
    Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation next year likely. The project to build the New Wear Crossing is now half way through with the first half of the steel deck bridge poised mid-river. Completion of the bridge is expected in the spring of 2018. This month, hydraulic jack
  • First stage of Chain of Rocks Bridge demolition carried out in US
    January 21, 2015
    Demolition work has been carried out on the central section of the Chain of Rocks Bridge in the US. The bridge lies just to the north of the city of St Louis, with the eastern end of the structure on Chouteau Island in Illinois and the western end is in Missouri. For the demolition work to be carried out I-270 had to be closed to traffic, so as to ensure the new structure would not suffer damage and also to maximise safety. The other sections of the bridge will be removed in due course.
  • VIDEO: Kangaroo takes out cyclist down under
    July 25, 2016
    It caught all the cyclists by surprise when a young bounding kangaroo decided to hurl itself at the peloton during a bicycle race in Australia. A fellow racer trailing behind took the video. The targeted cyclist was severely bruised from hitting the deck and he needed stitches. But the marauding kangaroo apparently died from its injuries when it slammed into the bike at a right angle. Cyclists being taken out by kangaroos is more common than most non-Australians would think. Click here to see one cycl
  • IBTTA global summit 2014 takes a balanced view on sustainable transport
    October 8, 2014
    The upcoming International Bridge, Tunnel, and Turnpike Association (IBTTA) 2014 global summit in Prague, Czech Republic, will be focusing on “Sustainable Transport & Mobility for People and Goods” say the organisers with key sessions looking at “strategic issues such as interoperability (EETS/REETS), road safety, environmental protection, traffic in cities, big data, road user charging around the World and future developments, trends, and technologies.”