Skip to main content

VIDEO: London’s Silvertown Tunnel gets approval

October 13, 2016
A road tunnel costing €1 billion and a €111 million cycle and pedestrian bridge are among three infrastructure projects given the go-ahead by London’s mayor.

The Silvertown Tunnel and the cycle and pedestrian bridge will link the Canary Wharf area north of the River Thames with Rotherhithe on the south bank.

London mayor Sadiq Khan also approved an extension to the Docklands Light Railway that would run to Gallions Reach on the south bank of the Thames.

Two other crossing are under consultation, according to a local media reports. A ferry route would run between the Isle of Dogs and North Greenwich and a London Overground railway from Abbey Wood to Barking Riverside.

Business groups welcomed the news but there has been continuing opposition from environmental groups and local campaigners who claim that the routes would worsen air quality.

The twin-bore Silvertown Tunnel will be constructed just east of the Blackwall Tunnel that suffers from growing congestion. Silvertown is expected to be a toll road with discounts for local residents and be open by 2023. Construction of the design, build, finance and maintenance project could start in 2018-19. Construction could take just over four years followed by a 25-year concession.

Prequalification documents should be submitted to the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal procurement department of Transport for London (TfL A web link to submit the documents false https://tflsilvertown.bravosolution.co.uk/web/login.shtml false false%>) before the end of November.

Related Content

  • VIDEO: Flux Capacitor takes off on an electrifying winning ride
    July 25, 2016
    Blue smoke belches from spinning tyres as possibly the world’s fastest street-legal electric vehicle takes off down the track at Santa Pod Raceway in the UK. Sports journalist and commentator Jonny Smith pushed his bright orange Flux Capacitor, a reworked electric Enfield 8000 from the 1970s, to a sub-10 second quarter mile - 9.86 seconds to reach 121.73mph. Not bad for a car designed with a top speed of 40mph in mind. The noise in the video is from the petrol-engine car that struggled to keep up.
  • VIDEO: Flux Capacitor takes off on an electrifying winning ride
    July 25, 2016
    Blue smoke belches from spinning tyres as possibly the world’s fastest street-legal electric vehicle takes off down the track at Santa Pod Raceway in the UK. Sports journalist and commentator Jonny Smith pushed his bright orange Flux Capacitor, a reworked electric Enfield 8000 from the 1970s, to a sub-10 second quarter mile - 9.86 seconds to reach 121.73mph. Not bad for a car designed with a top speed of 40mph in mind. The noise in the video is from the petrol-engine car that struggled to keep up.
  • Cost rises again for Columbia’s unfinished La Linea tunnel
    February 3, 2015
    Columbia’s transport minister has said it will take nearly US$168 million and more than two years to finish the controversial La Linea tunnel. Natalia Abello Vives said the government has a “plan B” to finish the 8.65km tunnel, which, as World Highways reported in May, has less than a kilometre remaining to be constructed. It was originally scheduled to be open by last November. The La Linea tunnel project, or Segundo Centenario tunnel, crosses the central mountain range and forms part of the Bogota-B
  • Parsons' $12.4 million I-65/I-70 South Split Indianapolis project is a top ten hit
    October 1, 2014
    Engineering and consultancy group Parsons has revealed that its $12.4 million I-65/I-70 South Split project in downtown Indianapolis has been named one of America’s Top 10 Transportation Projects by the American Association of State Highway and Transportation Officials (AASHTO), the American Automobile Association (AAA), and the U.S. Chamber of Commerce. The project, which has been designed by Parsons, will now go an online national vote the People’s Choice Awards.