Skip to main content

VIDEO: Life in the deteriorating lane – Pennsylvania Turnpike

October 17, 2016
Nothing lasts forever, including – and perhaps especially – highways. One fine example of this is a 21km section of the original 580km Pennsylvania Turnpike in the US state of Pennsylvania.

As the video shows, vegetation, animals and cyclists have slowly been reclaiming part of what was hailed as an engineering masterpiece when it was opened in 1940.

The Pennsylvania Turnpike Commission sold most of the disused section to the Southern Alleghenies Conservancy for $1 in 2001. The crumbling concrete strip is now managed by Friends of the Pike 2 Bike, a coalition of non-profit groups.

Many videos exist of people walking and bicycling down the road and the images, while at once very scenic, are also very melancholic.

It was called the Tunnel Highway because of its seven tunnels: Blue Mountain, Kittatinny Mountain, Tuscarora Mountain, Sideling Hill, Rays Hill, Allegheny Mountain and Laurel Hill. There was one tunnel through each mountain and the highway was reduced to a single lane in each direction through each tunnel. These tunnels were originally built as part of the South Pennsylvania Railroad. One short tunnel was bypassed during the original construction of the Turnpike.

By the late 1950s, the turnpike was heavily congested. To alleviate the situation, there was twinning of four tunnels - construction a second, parallel, two-lane tunnel – and also bypassing and closure of the other three.

The tunnelled section was abandoned in 1968 when a new bypass route was built uphill and parallel to it.

But all is not lost. Videos exist of %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal people travelling Visit www.youtube.com page false http://www.youtube.com/watch?v=OOP_QoizcWc#t=138.89297 false false%> the now abandoned section.

An especially good video shows how the tunnelled section %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal was built Visit www.youtube.com page false http://www.youtube.com/watch?v=1pYWj64bXk4 false false%>.

Related Content

  • Lino Sella World has concrete presence in mixer market
    April 8, 2013
    Lino Sella World, the Italian concrete and mortar mixer manufacturer celebrating its 50th trading anniversary during 2013, exports worldwide while maintaining a strong Italian market presence. With a wide range of 140 to 500litre capacity mixers, Lino Sella World also produces hydraulic mixers with capacities from 520 up to 1500litres. The firm says all its machines are robust and made to a high standard with quality materials.
  • Deutz’s 500,000th engine for Atlas Copco
    April 19, 2013
    Deutz will this year achieve its 500,000th engine sale to Atlas Copco, marking an impressive milestone in a business relationship stretching back 57 years. In addition to the main Atlas Copco brand, Deutz also supplies other well-known companies in the Group, such as Dynapac and Chicago Pneumatic in China. Virtually the entire Deutz product range is in use in Atlas Copco group machines.
  • First public outing for Liebherr tower crane at INTERMAT
    January 6, 2017
    Liebherr used INTERMAT 2012 to show its new 380 EC-B 16 Litronic flat-top crane. The 380tonne unit tops the 15-model range, which starts from 50tonnes. The new “flagship” can lift loads of up to 3,400kg at its 75m maximum radius. With the Litronic system, the 380 EC-B 16 can provide up to 20% more load lift at the push of a button. This is achieved by integrating the load-moment limiting system, the ABB operating-range limiting system and the MDA machine data evaluation program.
  • First public outing for Liebherr tower crane at INTERMAT
    April 20, 2012
    Liebherr used INTERMAT 2012 to show its new 380 EC-B 16 Litronic flat-top crane. The 380tonne unit tops the 15-model range, which starts from 50tonnes. The new “flagship” can lift loads of up to 3,400kg at its 75m maximum radius. With the Litronic system, the 380 EC-B 16 can provide up to 20% more load lift at the push of a button. This is achieved by integrating the load-moment limiting system, the ABB operating-range limiting system and the MDA machine data evaluation program.