Skip to main content

VIDEO: Life in the deteriorating lane – Pennsylvania Turnpike

October 17, 2016
Nothing lasts forever, including – and perhaps especially – highways. One fine example of this is a 21km section of the original 580km Pennsylvania Turnpike in the US state of Pennsylvania.

As the video shows, vegetation, animals and cyclists have slowly been reclaiming part of what was hailed as an engineering masterpiece when it was opened in 1940.

The Pennsylvania Turnpike Commission sold most of the disused section to the Southern Alleghenies Conservancy for $1 in 2001. The crumbling concrete strip is now managed by Friends of the Pike 2 Bike, a coalition of non-profit groups.

Many videos exist of people walking and bicycling down the road and the images, while at once very scenic, are also very melancholic.

It was called the Tunnel Highway because of its seven tunnels: Blue Mountain, Kittatinny Mountain, Tuscarora Mountain, Sideling Hill, Rays Hill, Allegheny Mountain and Laurel Hill. There was one tunnel through each mountain and the highway was reduced to a single lane in each direction through each tunnel. These tunnels were originally built as part of the South Pennsylvania Railroad. One short tunnel was bypassed during the original construction of the Turnpike.

By the late 1950s, the turnpike was heavily congested. To alleviate the situation, there was twinning of four tunnels - construction a second, parallel, two-lane tunnel – and also bypassing and closure of the other three.

The tunnelled section was abandoned in 1968 when a new bypass route was built uphill and parallel to it.

But all is not lost. Videos exist of %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal people travelling Visit www.youtube.com page false http://www.youtube.com/watch?v=OOP_QoizcWc#t=138.89297 false false%> the now abandoned section.

An especially good video shows how the tunnelled section %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal was built Visit www.youtube.com page false http://www.youtube.com/watch?v=1pYWj64bXk4 false false%>.

Related Content

  • IJM backs out of deal to buy Malaysian road operator SILK
    November 25, 2014
    IJM, one of Malaysia’s largest construction conglomerates, has bailed out of a deal to buy the highways concession business SILK. SILK Holdings, owner of the subsidiary SILK, Sistem Lingkaran-Lebuhraya Kajang, and IJM agreed to end the US$118 million takeover deal that was announced in June, the Sun newspaper reported. SILK holds the concession for the 37km Kajang Traffic Dispersal Ring Road, also called the Silk Highway, until 2037. The road opened in 2004. IJM noted in June, in its filing of intention
  • Wood you ride these? The Igorot tribe in the Philippines do
    June 22, 2015
    Wood you ride these? The Igorot tribe in the Philippines do Possibly the most eco-friendly bicycle is to be found in the Philippines, and they race them once a year, reaching speeds of nearly 40kph downhill – with no brakes. The bicycles are made entirely of wood, but the beauty is in the carving. Each cycle is a unique ornate cycle – hand-carved by its owner, a member of the Igorot tribe. The cycle race gathering is held in the town of Batad in the mountains of Luzon, the Philippines largest and m
  • Bridge building in miniature by Cimolai
    January 6, 2017
    Bespoke equipment supplier Cimolai Technology is exhibiting a model of the equipment it supplied for a Bulgarian bridge project. Construction of the bridge entailed lifting and positioning pre-cast sections weighing up to 260tonnes. Cimolai designed, built and supplied a bespoke cantilever lifting system to sit atop the centre pillar and simultaneously hoist the blocks from barges 42m below on the river Danube. The company said its European contracting customers are increasingly winning orders further afiel
  • Bridge building in miniature by Cimolai
    April 19, 2013
    Bespoke equipment supplier Cimolai Technology is exhibiting a model of the equipment it supplied for a Bulgarian bridge project. Construction of the bridge entailed lifting and positioning pre-cast sections weighing up to 260tonnes. Cimolai designed, built and supplied a bespoke cantilever lifting system to sit atop the centre pillar and simultaneously hoist the blocks from barges 42m below on the river Danube. The company said its European contracting customers are increasingly winning orders further afiel