Skip to main content

VIDEO: Life in the deteriorating lane – Pennsylvania Turnpike

October 17, 2016
Nothing lasts forever, including – and perhaps especially – highways. One fine example of this is a 21km section of the original 580km Pennsylvania Turnpike in the US state of Pennsylvania.

As the video shows, vegetation, animals and cyclists have slowly been reclaiming part of what was hailed as an engineering masterpiece when it was opened in 1940.

The Pennsylvania Turnpike Commission sold most of the disused section to the Southern Alleghenies Conservancy for $1 in 2001. The crumbling concrete strip is now managed by Friends of the Pike 2 Bike, a coalition of non-profit groups.

Many videos exist of people walking and bicycling down the road and the images, while at once very scenic, are also very melancholic.

It was called the Tunnel Highway because of its seven tunnels: Blue Mountain, Kittatinny Mountain, Tuscarora Mountain, Sideling Hill, Rays Hill, Allegheny Mountain and Laurel Hill. There was one tunnel through each mountain and the highway was reduced to a single lane in each direction through each tunnel. These tunnels were originally built as part of the South Pennsylvania Railroad. One short tunnel was bypassed during the original construction of the Turnpike.

By the late 1950s, the turnpike was heavily congested. To alleviate the situation, there was twinning of four tunnels - construction a second, parallel, two-lane tunnel – and also bypassing and closure of the other three.

The tunnelled section was abandoned in 1968 when a new bypass route was built uphill and parallel to it.

But all is not lost. Videos exist of %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal people travelling Visit www.youtube.com page false http://www.youtube.com/watch?v=OOP_QoizcWc#t=138.89297 false false%> the now abandoned section.

An especially good video shows how the tunnelled section %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal was built Visit www.youtube.com page false http://www.youtube.com/watch?v=1pYWj64bXk4 false false%>.

Related Content

  • Element Six promises up to 40 times the life of standard milling machine picks
    February 7, 2013
    Element Six, the synthetic diamond division of DeBeers, has developed a revised design for its D Power road picks, claiming greatly extended working life. The D Power road pick will use a polycrystalline diamond (PCD) tip with an improved head design that incorporates tungsten carbide to provide greater protection to the steel pick mount. The company claims that the D Power road pick can deliver up to 40 times the life of a standard carbide pick, providing reduced downtime, increased efficiency and a better
  • Golden opportunity at AAPA 2015 International Flexible Pavements Conference
    August 19, 2015
    In just under four weeks, on Australia’s Gold Coast, the best minds in the global flexible pavement industry will gather for the Australian Asphalt Pavement Association’s 2015 International Flexible Pavements Conference. Experts will be presenting the most up-to-date technical information as well as real life examples of applied technology to projects, whether they be roads, tunnels, ports or airports. “This is a must-attend event for all in road construction and maintenance,” said Michael Caltabiano,
  • Nylacast is offering long life crane sheaves
    January 6, 2017
    The novel cranes sheaves now being offered by component specialist Nylacast are said to extend rope wear life and reduce maintenance needs. The innovative polymer formulation shares technology with the proven Bigfoot outrigger pads, which help with load distribution in crane lift applications. The new polymer sheaves are said to offer key benefits over existing steel sheaves such as lower weight, which makes them easier to handle during installation or replacement.
  • Nylacast is offering long life crane sheaves
    March 27, 2013
    The novel cranes sheaves now being offered by component specialist Nylacast are said to extend rope wear life and reduce maintenance needs. The innovative polymer formulation shares technology with the proven Bigfoot outrigger pads, which help with load distribution in crane lift applications. The new polymer sheaves are said to offer key benefits over existing steel sheaves such as lower weight, which makes them easier to handle during installation or replacement.