Skip to main content

VIDEO: Kolin-Kalyon and Limak-Cengiz win North Marmara connector tenders

May 23, 2016
Turkey has awarded the much-delayed tenders for the motorway connector roads to Istanbul’s Third Bosphorus Bridge.

The 90km motorway section between Kinali and Odayeri was awarded to the Kolin-Kalyon joint-venture with completion in seven years and nine months, according to Turkish media reports. The 170km section between Kurtkoy and Akyazi was awarded to Limak-Cengiz joint-venture which will finish the work in six years and nine months.

The tenders were part of the 260km North Marmara Motorway project that includes the soon to be completed Yavus Sultan Selim Bridge. The Northern Marmara Motorway will, when completed, flow around the northern sections of Istanbul, the country’s financial centre.

The highway will cross the Bosphorus Strait over the Yavuz Sultan Selim Bridge and serve as the outermost beltway of Istanbul. The route runs from Kınalı on the European side to Akyazı on the Asian side. Importantly, the eastern end of the motorway will connect with the Otoyol 4, also known as Anadolu Otoyolu or Anatolia Motorway. The O-4 is a toll motorway connecting the northeastern Marmara Region to the Central Anatolia Region, including the capital Ankara.

The four-lane Third Bosphorus Bridge, now officially the Yavuz Sultan Selim Bridge, is a 2.2km cable-stayed and suspension crossing for rail and motor vehicles. The longest span is just over 1.4km and width is 58.4m. The bridge sits between Garipçe in Sarıyer on the European side and Poyrazköy in Beykoz on the Asian side. Work started in May 2013 and completion is expected later this year.

Related Content

  • Collaborative approach is delivering the Queensferry Crossing
    March 28, 2017
    The Queensferry Crossing forms the centrepiece of a major upgrade to the cross-Forth transport corridor in the east of Scotland. It will be the longest three-tower, cable-stayed bridge in the world and represents a Scottish Government capital investment of more than €1.5 billion. The 2.7km Queensferry Crossing is alongside the Forth Road Bridge and will carry the M90 motorway across the Firth of Forth between Lothian, at South Queensferry, and Fife, at North Queensferry. Each of the three towers are 207m
  • Romania to tender for another A8 segment
    September 6, 2023
    The segment between Targu Mures and Targu Neamt could cost upwards of €6.35 billion.
  • VIDEO: Sarens raises the pylon for New Wear Crossing in Sunderland
    February 13, 2017
    It was as weekend working in Sunderland city, northeast England, for global lifting specialist 8569 Sarens.

    Over the two days, the Belgian company gently raised a 1,550tonne steel pylon that will form the backbone of the New Wear Crossing – no official name yet – across the River Wear.

    General work on the two-span cable-stay bridge started on the bridge in May 2015. The structure will be supported by the single double pylon and will have four vehicle lanes, as well as dedicated cycle and pedestrian routes.
  • New Turkey tunnels for Istanbul and Izmir
    May 31, 2017
    New tunnel connections are to be built in Istanbul and Izmir, along with a new bridge in Izmir. Work is due to start shortly on the Grand Istanbul Tunnel Project. This will be a three level tunnel and should help lower congestion in Istanbul, which suffers amongst the worst traffic jams of any city in the world.