Skip to main content

VIDEO: Kolin-Kalyon and Limak-Cengiz win North Marmara connector tenders

May 23, 2016
Turkey has awarded the much-delayed tenders for the motorway connector roads to Istanbul’s Third Bosphorus Bridge.

The 90km motorway section between Kinali and Odayeri was awarded to the Kolin-Kalyon joint-venture with completion in seven years and nine months, according to Turkish media reports. The 170km section between Kurtkoy and Akyazi was awarded to Limak-Cengiz joint-venture which will finish the work in six years and nine months.

The tenders were part of the 260km North Marmara Motorway project that includes the soon to be completed Yavus Sultan Selim Bridge. The Northern Marmara Motorway will, when completed, flow around the northern sections of Istanbul, the country’s financial centre.

The highway will cross the Bosphorus Strait over the Yavuz Sultan Selim Bridge and serve as the outermost beltway of Istanbul. The route runs from Kınalı on the European side to Akyazı on the Asian side. Importantly, the eastern end of the motorway will connect with the Otoyol 4, also known as Anadolu Otoyolu or Anatolia Motorway. The O-4 is a toll motorway connecting the northeastern Marmara Region to the Central Anatolia Region, including the capital Ankara.

The four-lane Third Bosphorus Bridge, now officially the Yavuz Sultan Selim Bridge, is a 2.2km cable-stayed and suspension crossing for rail and motor vehicles. The longest span is just over 1.4km and width is 58.4m. The bridge sits between Garipçe in Sarıyer on the European side and Poyrazköy in Beykoz on the Asian side. Work started in May 2013 and completion is expected later this year.

Related Content

  • Bulgaria lets contract for Struma Motorway’s Zheleznitsa Tunnel
    February 15, 2019
    A consortium including local firms GP Group, Global Construction and Via Plan will build the 2km Zheleznitsa Tunnel, part of the Struma Motorway. The contract is worth around €97.5 million and the tunnel will be the longest in Bulgaria. The EU Cohesion Fund will co-finance the project, along with the Bulgarian government under the Operational Programme Transport and Transport Infrastructure 2014-2020. Completion is set for the end of 2023. Two previous tender processes to award the construction con
  • US highway bill finally receives approval by government
    September 27, 2012
    After a long series of delays, the US Government has finally managed to agree the latest highway reauthorisation bill. This comes after numerous short term extensions of the previous bill, due to political stalemate. The short term extensions were not sufficient to allow firms to invest and this situation stunted construction activity in the country. With the bill now in place, contractors will be able to look forward to some transport spending, and will likely increase spending on replacing old constructio
  • Canada, US officials soon to settle planned Detroit bridge issue
    February 5, 2015
    An end to a thorny issue is close at hand concerning who will fund construction of a border customs plaza on the US side of a planned bridge linking Canada and the United States. US President Barack Obama’s US$4-trillion budget did not set aside any money for the plaza for a second consecutive year, further irritating Canadian officials who are overseeing construction of the bridge. It appears that the Canadian government might end up footing the entire bill, according to a report in Toronto’s Globe a
  • LiuGong embraces Industry 4.0
    November 27, 2018
    LiuGong chairman Zeng Guang’an says that the firm is fully embracing Industry 4.0 technology. Coupled with ongoing machine development, an expanding global sales and manufacturing network and long-established strong relationships with customers and suppliers, this is enabling the Chinese construction equipment giant to target RMB 50 billion (US$7.18bn) operating revenue by 2025. Chairman Zeng outlined the impressive scale of LiuGong’s future ambitions during an impassioned speech in front of an audi