Skip to main content

VIDEO: Kolin-Kalyon and Limak-Cengiz win North Marmara connector tenders

May 23, 2016
Turkey has awarded the much-delayed tenders for the motorway connector roads to Istanbul’s Third Bosphorus Bridge.

The 90km motorway section between Kinali and Odayeri was awarded to the Kolin-Kalyon joint-venture with completion in seven years and nine months, according to Turkish media reports. The 170km section between Kurtkoy and Akyazi was awarded to Limak-Cengiz joint-venture which will finish the work in six years and nine months.

The tenders were part of the 260km North Marmara Motorway project that includes the soon to be completed Yavus Sultan Selim Bridge. The Northern Marmara Motorway will, when completed, flow around the northern sections of Istanbul, the country’s financial centre.

The highway will cross the Bosphorus Strait over the Yavuz Sultan Selim Bridge and serve as the outermost beltway of Istanbul. The route runs from Kınalı on the European side to Akyazı on the Asian side. Importantly, the eastern end of the motorway will connect with the Otoyol 4, also known as Anadolu Otoyolu or Anatolia Motorway. The O-4 is a toll motorway connecting the northeastern Marmara Region to the Central Anatolia Region, including the capital Ankara.

The four-lane Third Bosphorus Bridge, now officially the Yavuz Sultan Selim Bridge, is a 2.2km cable-stayed and suspension crossing for rail and motor vehicles. The longest span is just over 1.4km and width is 58.4m. The bridge sits between Garipçe in Sarıyer on the European side and Poyrazköy in Beykoz on the Asian side. Work started in May 2013 and completion is expected later this year.

Related Content

  • German highway project awarded
    January 25, 2021
    A key German highway project has been awarded.
  • IRF Global Road Achievement Award Laureate
    January 5, 2016
    As a key engineering project on the Changsha-Chongqing Expressway in Southwest China, the Aizhai Bridge, constructed by the Hunan Road & Bridge Construction Group, was opened to traffic in March 2012. The Aizhai Bridge crosses the 1000m-wide scenic Dehang Canyon at an elevation of 355m. It has a main span of 1,176m, making it the world’s longest canyon-crossing bridge in the world. The erection of the main girder (the stiffening girder) of the Aizhai Bridge encountered serious challenges, including a la
  • Award-winning road and bridge design software
    March 20, 2012
    The integration of software tools, users and data was an important factor in a major highway project The giant High Five interchange in Texas, USA, emerged as a key winner in Bentley Systems' software awards this year. It won both the Innovation in Road and Bridge category and, significantly, Connecting Project Teams. The awards, a feature of the annual exhibition/conference organised by the software house, attract increasing interest from industry, and competition has become widespread, not least bec
  • Jobs lost at ailing Cleveland Bridge
    August 6, 2021
    The steel fabricator in Darlington, England, is now up for sale.