Skip to main content

VIDEO: Kolin-Kalyon and Limak-Cengiz win North Marmara connector tenders

May 23, 2016
Turkey has awarded the much-delayed tenders for the motorway connector roads to Istanbul’s Third Bosphorus Bridge.

The 90km motorway section between Kinali and Odayeri was awarded to the Kolin-Kalyon joint-venture with completion in seven years and nine months, according to Turkish media reports. The 170km section between Kurtkoy and Akyazi was awarded to Limak-Cengiz joint-venture which will finish the work in six years and nine months.

The tenders were part of the 260km North Marmara Motorway project that includes the soon to be completed Yavus Sultan Selim Bridge. The Northern Marmara Motorway will, when completed, flow around the northern sections of Istanbul, the country’s financial centre.

The highway will cross the Bosphorus Strait over the Yavuz Sultan Selim Bridge and serve as the outermost beltway of Istanbul. The route runs from Kınalı on the European side to Akyazı on the Asian side. Importantly, the eastern end of the motorway will connect with the Otoyol 4, also known as Anadolu Otoyolu or Anatolia Motorway. The O-4 is a toll motorway connecting the northeastern Marmara Region to the Central Anatolia Region, including the capital Ankara.

The four-lane Third Bosphorus Bridge, now officially the Yavuz Sultan Selim Bridge, is a 2.2km cable-stayed and suspension crossing for rail and motor vehicles. The longest span is just over 1.4km and width is 58.4m. The bridge sits between Garipçe in Sarıyer on the European side and Poyrazköy in Beykoz on the Asian side. Work started in May 2013 and completion is expected later this year.

Related Content

  • Vietnam’s new beltway project
    October 12, 2018
    Work is progressing in Vietnam’s Ho Chi Minh City for construction of the new Beltway No3. An additional US$128.6 million is being set aside from the city’s budget to speed up work on the highway. The new beltway will measure 90km long, will allow vehicle speeds of up to 100km/h, with from two to four lanes in either direction. The route is being built in four sections. One stretch connects the Trung Luong expressway and National Highway No 22, another links National Highway No 22 and Binh Chuan, one joins
  • Croatia opens 17.5km section of Corridor 5c
    December 14, 2022
    The majority of the 5c, or Vc, route crosses Bosnia and Herzegovina and is a key priority for the European Bank for Reconstruction and Development (EBRD)
  • Eurobitume Preview 2012
    June 15, 2012
    Asphalt and bitumen industry attention is turning to the Eurasphalt and Eurobitume (E&E) Congress Congress being held next month in Istanbul, Turkey. Guy Woodford reports Held every four years, the Eurasphalt and Eurobitume Congress is always a well-attended event that can be both commercially beneficial and thought-provoking for asphalt and bitumen industry companies and organisations. Judging by a joint statement released by Eurobitume president Alberto Bardesi and European Asphalt Pavement Associatio
  • Tender cancelled for fifth section of Moscow’s central ring road
    December 15, 2014
    Russia’s Federal Antimonopoly Service has cancelled the results of a tender for construction and maintenance of the fifth section of the central ring road in the Moscow. The FAS made the announcement following an investigation based on a complaint from Stroygazconsulting, one of Russia’s largest infrastructure construction companies. The 23-year contract was awarded to the Koltsevaya Magistral. Stroygazconsulting complained that the bids for the contract, worth nearly US$752 million, were not evaluate