Skip to main content

VIDEO: Kolin-Kalyon and Limak-Cengiz win North Marmara connector tenders

May 23, 2016
Turkey has awarded the much-delayed tenders for the motorway connector roads to Istanbul’s Third Bosphorus Bridge.

The 90km motorway section between Kinali and Odayeri was awarded to the Kolin-Kalyon joint-venture with completion in seven years and nine months, according to Turkish media reports. The 170km section between Kurtkoy and Akyazi was awarded to Limak-Cengiz joint-venture which will finish the work in six years and nine months.

The tenders were part of the 260km North Marmara Motorway project that includes the soon to be completed Yavus Sultan Selim Bridge. The Northern Marmara Motorway will, when completed, flow around the northern sections of Istanbul, the country’s financial centre.

The highway will cross the Bosphorus Strait over the Yavuz Sultan Selim Bridge and serve as the outermost beltway of Istanbul. The route runs from Kınalı on the European side to Akyazı on the Asian side. Importantly, the eastern end of the motorway will connect with the Otoyol 4, also known as Anadolu Otoyolu or Anatolia Motorway. The O-4 is a toll motorway connecting the northeastern Marmara Region to the Central Anatolia Region, including the capital Ankara.

The four-lane Third Bosphorus Bridge, now officially the Yavuz Sultan Selim Bridge, is a 2.2km cable-stayed and suspension crossing for rail and motor vehicles. The longest span is just over 1.4km and width is 58.4m. The bridge sits between Garipçe in Sarıyer on the European side and Poyrazköy in Beykoz on the Asian side. Work started in May 2013 and completion is expected later this year.

Related Content

  • Colombia’s fourth generation road project tenders underway
    February 4, 2013
    The National Infrastructure Agency (ANI) in Colombia has opened a tender process for the first four out of 30 fourth generation road projects in the South American country. A total of US$24.75 billion (COP 44tn) is to be invested in the projects. The pre-qualified bidders will be known in around six weeks. The contracts will be awarded in September. The fourth generation road projects will be located in Costa Caribe, Valle del Cauca and Cundinamarca. They include the 164km Caqueza-La Calera-Sopo corridor, t
  • Dubai infrastructure development
    March 24, 2017
    New infrastructure is being built in Dubai with the help of machines from Volvo CE The Dubai Water Canal is being built in a busy and congested urban area, with the project including construction of major new road bridge crossings. The work is being carried out by Turkish infrastructure specialist DETECH Contracting. The 3.2km waterway is being built through downtown Dubai and is among the most ambitious projects being carried out in the country. When fully opened in 2017 the project – called The Duba
  • Plans moving forward for Major Turkish tunnel project
    March 16, 2015
    Plans are moving forward in Turkey for the construction of a new tunnel project. This new link will run under the busy Bosporus waterway and will connect Kucuksu on the Anatolian side and Gayrettepe on the European side. Approval for the work has been given by the Istanbul Municipality Council. And the timeline for the project calls for the route to be ready for use in five years time In all the route will pass through 12 districts, so some further approvals will be necessary however. The route will feature
  • Turkey’s roadbuilding programme provides asphalt demand
    June 28, 2013
    The Turkish Government has an extensive road-building programe - GÜLAY MALOKÇ provides an overview of the country's asphalt industry. Turkey covers an area approaching 800,000km2, of which about 97% is in Asia and 3% in Europe, while its population is close to 72 million. The country borders with Greece and Bulgaria on its European side, and Syria, Iraq, Iran, Armenia and Georgia on the Asian side. Commanding an important strategic position, Turkey controls the routes from the Black Sea to the Mediterranean