Skip to main content

VIDEO: Explosive bridge demolition in Southern Italy

February 15, 2016
Italian contractor General Smontaggi has carried out a successful bridge demolition project in the south of the country. Explosives were used to remove the redundant Viadotto Caffaro Bridge carrying the A3 Autostrade. The 390m long structure had been found to be unsuitable for modern traffic requirements on the route, located in Calabria. The demolition project was not straightforward as the new bridge had already been constructed alongside the redundant structure. The extensive pre-weakening work for the old bridge included cutting into the deck to ensure it collapsed downwards. The charges were timed in such a way as to break up the bridge deck first and allow those pieces to fall, before a second round of charges detonated to bring down the supports. The explosives for the supports were also placed very carefully to ensure that in falling, they would not strike any part of the new bridge.

Related Content

  • Morandi Bridge investigation continuing
    February 1, 2019
    The investigation into the collapse of the Morandi Bridge in the Italian city of Genoa is continuing. The failure of the bridge in August 2018 resulted in 43 fatalities. A central section of the structure collapsed and most of the deaths were of those crossing in vehicles at the time, although the deaths also included those hit by falling debris underneath. A number of engineers and managers with responsibilities relating to the bridge are now being investigated directly. The investigators are also looking
  • KIT to study bridge vibration data
    July 7, 2025
    In Germany, the Karlsruhe Institute of Technology, KIT, will use acceleration sensors to gather vibration data from bridges to pinpoint structural degradation.
  • Austria’s challenging highway bridge replacement
    January 20, 2025
    A challenging highway bridge replacement is planned for Austria.
  • Australian bridge slides into position
    July 18, 2012
    A heavy rail crossing as part of Australia's EastLink motorway demanded great ingenuity and careful planning Most of the 88 bridges on the EastLink tolled motorway in, Melbourne, Australia were kept as simple and straightforward as possible. Contractor Thiess John Holland (TJH) developed its own precast yard 150km from the city, which provided many of the prefabricated materials required for the structures. This offered speed and economy while logistics and sequencing were vital for their erection. But the