Skip to main content

VIDEO: Explosive bridge demolition in Southern Italy

February 15, 2016
Italian contractor General Smontaggi has carried out a successful bridge demolition project in the south of the country. Explosives were used to remove the redundant Viadotto Caffaro Bridge carrying the A3 Autostrade. The 390m long structure had been found to be unsuitable for modern traffic requirements on the route, located in Calabria. The demolition project was not straightforward as the new bridge had already been constructed alongside the redundant structure. The extensive pre-weakening work for the old bridge included cutting into the deck to ensure it collapsed downwards. The charges were timed in such a way as to break up the bridge deck first and allow those pieces to fall, before a second round of charges detonated to bring down the supports. The explosives for the supports were also placed very carefully to ensure that in falling, they would not strike any part of the new bridge.

Related Content

  • Terex cranes in a tight spot in Michigan
    February 6, 2017
    Terex cranes have been involved in a multiple bridge repair project in the US More than 96,000 vehicles per day travel a stretch of I-96, including its 52-year-old bridges. The Michigan Department of Transportation is in the midst of a two-year US$77 million project to repair bridges and relieve increasing congestion along Interstate 96 at the U.S. Highway 23 interchange in Livingston County. Toebe Construction along with joint venture partner Kamminga & Roodvoets are bringing in a lot of lifting powe
  • Award winning bridge for North Carolina
    November 21, 2019
    A new bridge in the US state of North Carolina has won a key award for excellence – Mike Woof writes
  • Efficient bridge demolition in China
    March 31, 2014
    A contractor in China has completed an effective bridge demolition job efficiently and quickly. The pre-weakened structure was brought crashing into the river it spanned following one final push using the boom of an excavator. The defunct bridge collapsed in a controlled fashion without injury or inconvenience, allowing the rubble to be removed in a subsequent operation.
  • New bridge installed in UK over busy rail line
    January 12, 2016
    Work to install a new bridge for the UK’s busiest rail freight line has been carried out over the A160 at the Port of Immingham. The project forms part of the Port of Immingham Improvement Scheme, a €118.15 million (£88.4 million) series of works being carried out on behalf of Highways England. The project involves upgrading 5km of the A160 from single carriageway to dual carriageway, and constructing a number of new structures. Because of the volume of rail traffic using the stretch of track, the new bridg