Skip to main content

VIDEO: Explosive bridge demolition in Southern Italy

February 15, 2016
Italian contractor General Smontaggi has carried out a successful bridge demolition project in the south of the country. Explosives were used to remove the redundant Viadotto Caffaro Bridge carrying the A3 Autostrade. The 390m long structure had been found to be unsuitable for modern traffic requirements on the route, located in Calabria. The demolition project was not straightforward as the new bridge had already been constructed alongside the redundant structure. The extensive pre-weakening work for the old bridge included cutting into the deck to ensure it collapsed downwards. The charges were timed in such a way as to break up the bridge deck first and allow those pieces to fall, before a second round of charges detonated to bring down the supports. The explosives for the supports were also placed very carefully to ensure that in falling, they would not strike any part of the new bridge.

Related Content

  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b
  • Italy’s horrific bridge collapse is a sign of a wider problem
    January 7, 2019
    The shocking collapse of a major highway bridge in the Italian city of Genoa has highlighted a major problem with regard to poor infrastructure condition in the country. Causing multiple fatalities, the cable-stayed Morandi Bridge suffered a spectacular failure of a central support. Homes have had to be evacuated and it seems likely that the bridge, opened in 1967, will now have to be demolished. However, warnings had been given. The unusual bridge design, with its thin deck and reinforced concrete stays