Skip to main content

VIDEO – Explosive blast apart redundant US bridge

July 13, 2015
The Donora-Webster Bridge over the Monongahela River in the US has been demolished using explosives. The ageing structure spanned the Monongahela River, connecting Washington and Westmoreland Counties in Pennsylvania. The bridge was built in 1908 and originally carried a rail link but in 1938 the tracks were removed and the structure was modified so that it could handle motor vehicle traffic instead. The Donora-Webster Bridge linked Route 837 on the west side of the Monongahela River with Route 906 on the east bank. The bridge was then closed to vehicle traffic in 2009 because the structural deficiencies had been identified by the local authorities. Despite being designated a historic bridge by the Washington County History & Landmarks Foundation, the Donora-Webster Bridge was earmarked for demolition. The contractor used close to 32.7kg of explosives placed at 387 separate points around the structure so as to break up its structural integrity, resulting in it crashing into the river below in a successfully controlled demolition.

Related Content

  • Major bridge widening project going to plan
    May 2, 2012
    When built it was determined that a vital US road/rail bridge would always be widened.
  • Bold move aids Ironton-Russell bridge works in U.S.
    January 24, 2014
    The bold decision to go against the norm and build the back spans using falsework for the Ironton-Russell replacement bridge between Parkersburg, Kentucky and Cincinnati, Ohio allowed land access to build the main span which, along with the first use in the U.S. of precast stay anchor blocks, meant the new structure could get built.
  • Major bridge widening project going to plan
    April 11, 2012
    When built it was determined that a vital US road/rail bridge would always be widened. Work on that huge project is going to plan as Patrick Smith reports One of the biggest bridge widening projects in the world is being carried out under an ambitious development programme. At US$1.2 billion, the seven-year scheme to widen the Huey P. Long Bridge in the US state of Louisiana is also the largest of 16 projects planned under the state's TIMED (Transportation Infrastructure Model for Economic Development)
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b