Skip to main content

VIDEO – Explosive blast apart redundant US bridge

July 13, 2015
The Donora-Webster Bridge over the Monongahela River in the US has been demolished using explosives. The ageing structure spanned the Monongahela River, connecting Washington and Westmoreland Counties in Pennsylvania. The bridge was built in 1908 and originally carried a rail link but in 1938 the tracks were removed and the structure was modified so that it could handle motor vehicle traffic instead. The Donora-Webster Bridge linked Route 837 on the west side of the Monongahela River with Route 906 on the east bank. The bridge was then closed to vehicle traffic in 2009 because the structural deficiencies had been identified by the local authorities. Despite being designated a historic bridge by the Washington County History & Landmarks Foundation, the Donora-Webster Bridge was earmarked for demolition. The contractor used close to 32.7kg of explosives placed at 387 separate points around the structure so as to break up its structural integrity, resulting in it crashing into the river below in a successfully controlled demolition.

Related Content

  • Explosive demolition fells old bridge in Mississippi
    June 23, 2014
    A demolition contractor used 180kg of explosives to bring down an old bridge structure in the US state of Mississippi. The Big Ridge Road Bridge in D’Iberville was demolished as part of a project as part of a US$41 million project to construct a new interchange. Work on the interchange is expected to be complete in 2015. The work is being carried out for the Mississippi Department of Transportation.
  • Historic US bridge upgrade in Washington DC
    July 8, 2016
    A heavily-used bridge of historic importance in US capital Washington DC looks set to benefit from much-needed improvement works. The work will be part funded by a US$90 million from the US Department of Transportation. The structure of the Arlington Memorial Bridge has become degraded over time and has been highlighted in a number of reports as being in dire need of a major rebuild. The 651m bridge links Washington District with Arlington County, carrying around 68,000 vehicles/day. But in all the bridge i
  • Airport runway rebuild at Bologna
    May 15, 2019
    Rebuilding a runway requires special attention to detail to maximise efficiency and safety Airport runways face special challenges with regard to the loads they carry on a daily basis, particularly when aircraft are landing. A modern jet aircraft will typically land at speeds of around 240-260km/h, with a laden 747 weighing as much as 265tonnes at the end of a long flight. The stresses these large aircraft place on runway surfaces are enormous and not just with the massive impact forces exerted during
  • VIDEO – demolition of UK’s M1 motorway overpass
    April 17, 2015
    Specialist contractor Armac recently demolished a bridge over the UK’s busy M1 motorway. The work was carried out within a tight timeframe as this important route could only be closed for a short period at night over a weekend when traffic would be at its lightest so as to minimise disruption.