Skip to main content

VIDEO – demolition of UK’s M1 motorway overpass

April 17, 2015
Specialist contractor Armac recently demolished a bridge over the UK’s busy M1 motorway. The work was carried out within a tight timeframe as this important route could only be closed for a short period at night over a weekend when traffic would be at its lightest so as to minimise disruption.

Equipment was used initially to prepare the site, so as to reduce the risk to the surrounding area. Blast curtains were set in place so as to minimise the spread of debris, before the charges were activated. With the bridge then demolished by the blast, a fleet of excavators with demolition attachments was then brought in to cut up the wreckage and reduce the rubble to a manageable size, allowing it to be transported away.

Video footage has finally emerged of Armac’s spectacular bridge implosion over the M1 motorway which took place a few weeks back.

This silent movie from the 2309 Highways Agency uses time-lapse to capture the preparation and the blast before the work really starts with around with something like 10 excavators cutting up and processing the fallen bridge deck.

The “Bridge Busters” then deploy a veritable fleet of equipment to clear the site in readiness for the reopening of Junction 19.

For more information on companies in this article

Related Content

  • Eradicating work zone danger
    June 26, 2013
    New safety systems for highway work zones are helping to reduce deaths and injuries in the United States, while much work is being done in Europe to improve work zone safety. Guy Woodford reports. With more road building underway than at any one time in Texas history, the US Lone Star state’s Department of Transportation (TxDOT) is introducing its first highway safety system with queue-warning technology and temporary rumble strips to cut work zone collisions. Debuting along a central Texas stretch of the
  • Crane lifts in bridge structure in Germany
    December 14, 2015
    A Terex crawler crane has been used to lift out a concrete bridge in the German town of Zweibrücken. The work was carried out shortly after the Terex Superlift 3800 lattice boom crawler crane had been supplied to Trier-based specialist Steil. The crane hire firm already had four Terex crawler cranes in its fleet with this new arrival bringing the number to five. The machine had a particularly short journey to make to the job site as it had just been manufacturerd at the Terex facility located in Zweibrü
  • VIDEO - Bridge demolition going wrong
    June 17, 2015
    A bridge demolition job went spectacularly wrong in Finland recently. Luckily for all concerned, there were no casualties, but it could have quite easily been a different story. A demolition contractor was using an excavator fitted with a hydraulic breaker to break up the structure, but the work was carrying on despite live traffic flowing on the road under the bridge.

    Note too the behaviour of drivers on the route after the initial collapse.

    This video came just as the European Demolition Association headed to Finland’s capital Helsinki to discuss best practice.
  • UK motorway bridge work
    June 10, 2025
    A new bridge now spans the UK’s busy M6 motorway.