Skip to main content

VIDEO – demolition of UK’s M1 motorway overpass

April 17, 2015
Specialist contractor Armac recently demolished a bridge over the UK’s busy M1 motorway. The work was carried out within a tight timeframe as this important route could only be closed for a short period at night over a weekend when traffic would be at its lightest so as to minimise disruption.

Equipment was used initially to prepare the site, so as to reduce the risk to the surrounding area. Blast curtains were set in place so as to minimise the spread of debris, before the charges were activated. With the bridge then demolished by the blast, a fleet of excavators with demolition attachments was then brought in to cut up the wreckage and reduce the rubble to a manageable size, allowing it to be transported away.

Video footage has finally emerged of Armac’s spectacular bridge implosion over the M1 motorway which took place a few weeks back.

This silent movie from the 2309 Highways Agency uses time-lapse to capture the preparation and the blast before the work really starts with around with something like 10 excavators cutting up and processing the fallen bridge deck.

The “Bridge Busters” then deploy a veritable fleet of equipment to clear the site in readiness for the reopening of Junction 19.

For more information on companies in this article

Related Content

  • Iterchimica trials more Gipave in Oxfordshire
    November 23, 2023
    Another trial of Iterchimica’s graphene-enhanced Gipave technology gets underway in the English county of of Oxfordshire.
  • Skidmarks
    December 15, 2017
    Our Skidmarks page is highly rated by readers. Your input could help make this page even more entertaining. If you come across any amusing road-related stories or pictures email me at [email protected]
  • Cold recycling helps rebuild of Brazil’s Ayrton Senna highway
    September 28, 2015
    Brazil’s Ayrton Senna Highway has been rebuilt using cold recycling. Brazil’s SP-070 is also known as the Ayrton Senna Highway and is a major highway in the country, carrying heavy traffic volumes. For its rebuild, the time-saving, cost-efficient and eco-friendly benefits of the cold recycling process have been put to the test. The SP-070 provides a key transport link between São Paulo and Campos do Jordão, Vale do Paraíba and Rio de Janeiro, as well as being the main access route to Guarulhos Interna
  • Let’s Boogie in a new tunnel
    July 7, 2020
    The new Victory Boogie Woogie Tunnel will be the most sustainable tunnel in the Netherlands.