Skip to main content

VIDEO - Controlled bridge demolition over motorway

September 15, 2016

A UK-based demolition contractor has carried out a successful bridge demolition project over the busy M1 motorway. The specialist firm, Amac Group, used a fleet of excavators fitted with hydraulic breakers and other attachments to break up the bridge in a single overnight possession from 10th-11th September 2016. The bridge demolition is the first of two being carried out as part of the improvement works for a new link road connecting the M1 and A5 routes. The second bridge removal is planned for the 24th-25th September.

No video provider was found to handle the given URL. See the documentation for more information.
No video provider was found to handle the given URL. See the documentation for more information.

Related Content

  • Fast flyover removal with specialist demolition equipment
    July 12, 2012
    An overcrowded Indian flyover was removed in record time using specialist demolition equipment, as Patrick Smith reports Demolition of the landmark Lalbaug flyover south of central Mumbai has been completed and work on a new bigger bridge has started in India's largest city. Although the 38-year-old Sant Dnyaneshwar (Lalbaug flyover) two-lane, one-way traffic artery was serviceable and used by to 15,000 vehicles/hour, there were daily traffic jams and environmental consequences. Despite the complex and dema
  • VIDEO: Successful explosive bridge demolition in Kentucky
    July 28, 2016
    A successful explosive bridge demolition job has been carried out in the US State of Kentucky. After a short delay, demolition specialists managed to remove the old Eggners Ferry Bridge successfully and without incident. The explosives broke up the four middle spans of the structure. The demolition job was not without its challenges, with concern over the presence of nesting ospreys on the structure. Demolition personnel had to keep a distance of 90m from the nesting area, which delayed preparations.
  • Flyover removal completed successfully
    February 15, 2021
    A flyover removal project has been completed successfully in the UK.
  • Fast-track demolition
    June 18, 2012
    Heavy hydraulic breakers and a six-tonne combi cutter from Atlas Copco is said to have played a key part in enabling Armac to complete the demolition of the former Catthorpe motorway interchange viaduct within the 36 hours prescribed by the Highways Agency. Bridge dismantling experts Armac deployed no fewer than 10 Atlas Copco hydraulic breakers – six HB 4200, two HB 5800 and two HB 7000 units – to dismantle the 5,500tonne, 85metre long structure. In addition, Armac also used an Atlas Copco CC 6000 hydrauli