Skip to main content

VIDEO - Controlled bridge demolition over motorway

September 15, 2016

A UK-based demolition contractor has carried out a successful bridge demolition project over the busy M1 motorway. The specialist firm, Amac Group, used a fleet of excavators fitted with hydraulic breakers and other attachments to break up the bridge in a single overnight possession from 10th-11th September 2016. The bridge demolition is the first of two being carried out as part of the improvement works for a new link road connecting the M1 and A5 routes. The second bridge removal is planned for the 24th-25th September.

No video provider was found to handle the given URL. See the documentation for more information.
No video provider was found to handle the given URL. See the documentation for more information.

Related Content

  • High speed bridge demolition minimises disruption
    February 16, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.
  • Versatility for demolition and recycling
    July 31, 2012
    A growing demand for equipment to be used in recycling applications is helping boost the market for demolition attachments Manufacturers have been keen to invest in technology, developing new models and with more innovations to come. There are several key players in the hydraulic breaker sector, with Atlas Copco and Sandvik dominating this market segment. However other breaker manufacturers are major players too, including Indeco, Furukawa and NPK, while there are also specialist attachment producers such a
  • Bridge demolition with breakers
    May 5, 2021
    Hydraulic breakers from Italian firm Indeco have been used successfully to carry out important work on the Princes Freeway in Australia’s Victoria State.
  • VIDEO: Saskatoon bridge demolition removes final span
    November 18, 2016
    The final section of a defunct bridge in Saskatoon has now been removed by demolition contractor Rakowski Cartage & Wrecking. Excavators fitted with hydraulic breakers were employed by the firm to break up the final span, which collapsed into the river as planned. Demolition work to remove the defunct structure commenced in 2012. Other sections of the bridge were removed using explosive demolition earlier this year.