Skip to main content

VIDEO - Controlled bridge demolition over motorway

September 15, 2016

A UK-based demolition contractor has carried out a successful bridge demolition project over the busy M1 motorway. The specialist firm, Amac Group, used a fleet of excavators fitted with hydraulic breakers and other attachments to break up the bridge in a single overnight possession from 10th-11th September 2016. The bridge demolition is the first of two being carried out as part of the improvement works for a new link road connecting the M1 and A5 routes. The second bridge removal is planned for the 24th-25th September.

No video provider was found to handle the given URL. See the documentation for more information.
No video provider was found to handle the given URL. See the documentation for more information.

Related Content

  • VIDEO - Canadian contractor demolishing overpass
    July 13, 2015
    Canadian contractor Delsan has carried out a successful demolition of an overpass in Quebec. The firm used a number of John Deere excavators equipped with breakers and cutters to break up the overpass in a controlled demolition job. The structure was located in Sainte-Anne-de-Bellevue and needed to be removed as it had been made redundant.
  • Australian bridge slides into position
    July 18, 2012
    A heavy rail crossing as part of Australia's EastLink motorway demanded great ingenuity and careful planning Most of the 88 bridges on the EastLink tolled motorway in, Melbourne, Australia were kept as simple and straightforward as possible. Contractor Thiess John Holland (TJH) developed its own precast yard 150km from the city, which provided many of the prefabricated materials required for the structures. This offered speed and economy while logistics and sequencing were vital for their erection. But the
  • VIDEO: US bridge removed with explosive demolition
    September 28, 2015
    A defunct bridge has been removed in the US State of Louisiana using explosive demolition techniques. The OK Allen Bridge was removed at the weekend, following a planned blast carried out by a demolition specialist. The bridge psanned the Red River for 79 years, providing a connection between Alexandria and Pineville. Traffic was halted on the Curtis-Coleman Bridge, which carries US 71, for safety during the demolition. The steelwork of the old bridge will be removed from the river and sold for scrap, although its concrete piers still have to be demolished.
  • Austria’s challenging highway bridge replacement
    January 20, 2025
    A challenging highway bridge replacement is planned for Austria.