Skip to main content

VIDEO: Companies pre-qualify for Fehmarnbelt Fixed Link consulting

November 3, 2016
4782 Femern, the company charged with building what will be the world’s longest submerged tunnel, has prequalified companies for consulting work.

The companies will be able to tender for two framework agreements, one for client consulting services and the other for technical in-house consulting services.

Femern is responsible for building the 18km Fehmarnbelt Fixed Link immersed tunnel between Rødbyhavn in Denmark and Puttgarden in Germany. The estimated cost has increased over the past several years to reach around €7.4 billion.

The tunnel design is for a four-lane motorway running beside a dual-track electrified railway. The project also includes upgraded rail and motorway connections from Ringsted to Rødby in Denmark and from Puttgarden to Lübeck in Germany.

The framework on client consulting covers the periods up to and during construction and then transition to the operational phase. It also covers assistance relating to potential claims from the contractors during construction and for a period after the end of construction work.

Companies operating under the framework for technical in-house consulting services will work alongside Femern’s own technical division as an added resource.

Companies prequalified for technical in-house consulting includes 2874 CH2M HILL UK, EKJ-ILF-GEO (Denmark, Austria), Rambøll-1419 Arup-1421 TEC Joint Venture (Denmark, UK, Netherlands), WTM Engineers (Germany), 3392 Sweco Danmark, ÅF – Hansen & Henneberg (Denmark) and AF Infrastructure (Sweden).

Companies prequalified for client consulting work includes CH2M HILL UK, Rambøll-Arup-TEC Joint Venture (Denmark, UK, Netherlands), Sweco Danmark (Denmark) and ÅF Infrastructure AB (Sweden).

Work is expected to start in 2019 as the earliest, although it remains subject to approval by German authorities. Approval could come next year.

Earlier this year, the Danish government has awarded €4.4 billion worth of contracts to an international consortium that includes German Wayss und Freytag Ingenieurbau, Max Bögl Stiftung and Netherlands-based BAM. Contracts include the excavation and construction of underground tunnels, manufacture of internal tunnel elements and the entry and exit ramps.

For more information on companies in this article

Related Content

  • Denmark to create Rodby port to service Fehmarn Belt construction
    January 6, 2015
    The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe
  • Denmark concerned over rising cost of Fehmarn Belt Fixed Link
    February 19, 2015
    The Danish government is in talks with contractors over the latest rise in cost estimates for the proposed prestigious Fehmarn Belt Fixed Link between Denmark and Germany. Contractors have estimated an extra €295.5 million will be needed. This is in addition to a statement last November by the contracting company Femern saying that costs had risen nearly €900 million. The total rise price hike is nearly €1.2 billion. This puts the final cost of the 18km tunnel including two railway tunnels, two motorway tun
  • Femern to tender for Fehmarnbelt rail works
    January 16, 2023
    The contract will comprise a 25km two-track railway to run trains at 200kph and a catenary system of which 18km will be inside the immersed road-rail Fehmarnbelt Tunnel.
  • More EU money for Fehmarn Belt Link
    July 4, 2022
    The money underlines the importance of the 17.6km Fehmarnbelt tunnel project for the entire European road network.