Skip to main content

VIDEO: Companies pre-qualify for Fehmarnbelt Fixed Link consulting

November 3, 2016
4782 Femern, the company charged with building what will be the world’s longest submerged tunnel, has prequalified companies for consulting work.

The companies will be able to tender for two framework agreements, one for client consulting services and the other for technical in-house consulting services.

Femern is responsible for building the 18km Fehmarnbelt Fixed Link immersed tunnel between Rødbyhavn in Denmark and Puttgarden in Germany. The estimated cost has increased over the past several years to reach around €7.4 billion.

The tunnel design is for a four-lane motorway running beside a dual-track electrified railway. The project also includes upgraded rail and motorway connections from Ringsted to Rødby in Denmark and from Puttgarden to Lübeck in Germany.

The framework on client consulting covers the periods up to and during construction and then transition to the operational phase. It also covers assistance relating to potential claims from the contractors during construction and for a period after the end of construction work.

Companies operating under the framework for technical in-house consulting services will work alongside Femern’s own technical division as an added resource.

Companies prequalified for technical in-house consulting includes 2874 CH2M HILL UK, EKJ-ILF-GEO (Denmark, Austria), Rambøll-1419 Arup-1421 TEC Joint Venture (Denmark, UK, Netherlands), WTM Engineers (Germany), 3392 Sweco Danmark, ÅF – Hansen & Henneberg (Denmark) and AF Infrastructure (Sweden).

Companies prequalified for client consulting work includes CH2M HILL UK, Rambøll-Arup-TEC Joint Venture (Denmark, UK, Netherlands), Sweco Danmark (Denmark) and ÅF Infrastructure AB (Sweden).

Work is expected to start in 2019 as the earliest, although it remains subject to approval by German authorities. Approval could come next year.

Earlier this year, the Danish government has awarded €4.4 billion worth of contracts to an international consortium that includes German Wayss und Freytag Ingenieurbau, Max Bögl Stiftung and Netherlands-based BAM. Contracts include the excavation and construction of underground tunnels, manufacture of internal tunnel elements and the entry and exit ramps.

For more information on companies in this article

Related Content

  • Fehmarn Fixed Link project finally gets European Commission approval
    March 31, 2020
    EC settles the public financing issue for the Fehmarn project that includes an immersed tunnel.
  • Construction of Fehmarn Belt Link could start in 2019
    February 27, 2018
    Construction of a Fehmarn Belt Link could start a year from now – more than a year ahead of schedule, according to Danish media reports. The timing was put forward by Holger Schou Rasmussen, chairman of Femernbælt Development, and Kristian Pihl Lorenzen, the Liberal Party spokesman for traffic issues. They reportedly said that a pending environmental court case in Germany that has stalled approval by German authorities won’t hold up construction of the 18km crossing as much as had been feared. As late as
  • Work to start on Fehmarn Belt link to start in autumn
    April 4, 2019
    Construction of the Fehmarn Belt Fixed Link between Denmark and Germany should start this autumn for completion in 2028, according to the Danish government. Danish company Femern, which is responsible for the construction of the link, will begin negotiations with two contractor consortiums for the first of the project’s works which will start on the Danish side. A tunnel element fabrication yard and a works harbour must be built in Rødbyhavn, as well as a tunnel portal on Lolland. An autumn start wou
  • Fehmarnbelt hearings to start
    September 24, 2020
    The Danish-German project has come under financial and environmental criticism.