Skip to main content

Video captures nocturnal bridge demolition in Germany’s Ruhr area

November 17, 2014
It was a 24-hour job to demolish the bridge called On Leiterchen that crossed over the A43 in the industrial Ruhr area of the German state of North Rhine-Westphalia.

Traffic was stopped in both directions between junctions Recklinghausen-Hochlarmark and Recklinghause-Herten.

Before the serious work of nibbling away at the concrete structure could start, a 50cm layer of sand was spread across the entire motorway to protect the pavement from excavator machine tracks and falling concrete. The bridge eventually jack-knifed in on itself.

Equipment used included Cat 336D and E excavators, three Hitachi ZX350 and one ZX470 excavators and two Mercedes Benz Arocs dump trucks.

Related Content

  • Making the U-turn
    August 2, 2012
    Political hostility to a toll road project in Australia has been turned around by the quality and amenity of the project writes Adrian Greeman Cars, trucks and vans were taking to the new EastLink toll road in Melbourne with enthusiasm this July, pleased to try out its 39km route for time and cost savings. As well as the convenience of the uncongested route, drivers were also able to view an extraordinary multi-shaded perspective of transparent green and orange noise wall panels, burnt earth-coloured retai
  • India’s new expressway link
    April 12, 2021
    Accelerated road construction methods are being used to build an expressway link in India, setting records along the way
  • Maybe Hire takes on Whorlton Bridge
    March 14, 2025
    For refurbishment of the old English bridge, a temporary cable crane structure - designed by CaSE Civil & Structural Engineering - used a range of Mabey Hire’s propping equipment, including the Mass 50, System 160 and Mat 125 products.
  • Bentley’s Be Inspired Awards highlight innovation in software use
    January 6, 2015
    Innovation, from design to on-site execution, is alive and well, thanks to a good helping of software application. David Arminas reports from software developer Bentley’s annual global conference, held this year in London Successful project delivery is increasingly about hard men and women using software to get the job done and this year’s global conference in London by US-based software developer Bentley highlighted some innovative - and startling - examples. As usual, the Year in Infrastructure 2014