Skip to main content

Video captures nocturnal bridge demolition in Germany’s Ruhr area

November 17, 2014
It was a 24-hour job to demolish the bridge called On Leiterchen that crossed over the A43 in the industrial Ruhr area of the German state of North Rhine-Westphalia.

Traffic was stopped in both directions between junctions Recklinghausen-Hochlarmark and Recklinghause-Herten.

Before the serious work of nibbling away at the concrete structure could start, a 50cm layer of sand was spread across the entire motorway to protect the pavement from excavator machine tracks and falling concrete. The bridge eventually jack-knifed in on itself.

Equipment used included Cat 336D and E excavators, three Hitachi ZX350 and one ZX470 excavators and two Mercedes Benz Arocs dump trucks.

Related Content

  • Tunnels eliminate bottlenecks
    February 10, 2012
    Some of the bottlenecks on the multi-lane Mittlere Ring, Munich, Germany, one of the main arterial roads circling the city centre have been eliminated by the addition of new tunnels. The Luise-Kiesselbach Square, the last section of this road improvement effort, is an important traffic hub south-west of the city where motorways A96 from Lindau and A5 from Garmisch meet, causing long delays in daily rush-hour traffic, writes Patrick Smith.
  • Doosan machines for B2 highway project in Germany
    January 30, 2014
    Thannhauser + Ulbricht Straßen- und Tiefbau of Fremdingen in Southern Germany, is currently upgrading the country's B 2 federal highway near the town of Roth and employing four new Doosan DA30 articulated dump trucks (ADTs) and a new Doosan DX490LC-3 crawler excavator for the earthmoving work. The machines belong to the rental fleet of Rühle Maschinenpark, based in Untermünkheim-Haagen, South West Germany. The B 2 is one of Germany's oldest highways and runs the entire length of the country for a distance
  • New non-destructive testing technologies for roads and bridges
    July 11, 2018
    Two new technologies for non-destructive testing offer key benefits, one suiting road surfaces, the other suiting concrete structures - Kristina Smith reports Dynatest has developed a new way to measure and record the state of pavements, using a machine that travels at the same speed as traffic. The Rapid Pavement Tester (Raptor) has been seven years in the making and offers road owners the chance to have comprehensive surveys without the need to disrupt traffic. “People have been wanting to do this for
  • VIDEO: Successful explosive bridge demolition in Kentucky
    July 28, 2016
    A successful explosive bridge demolition job has been carried out in the US State of Kentucky. After a short delay, demolition specialists managed to remove the old Eggners Ferry Bridge successfully and without incident. The explosives broke up the four middle spans of the structure. The demolition job was not without its challenges, with concern over the presence of nesting ospreys on the structure. Demolition personnel had to keep a distance of 90m from the nesting area, which delayed preparations.