Skip to main content

VIDEO - Canadian contractor demolishing overpass

July 13, 2015
Canadian contractor Delsan has carried out a successful demolition of an overpass in Quebec. The firm used a number of John Deere excavators equipped with breakers and cutters to break up the overpass in a controlled demolition job. The structure was located in Sainte-Anne-de-Bellevue and needed to be removed as it had been made redundant.

Related Content

  • Wirtgen machines help with road recycling in Italy
    March 18, 2016
    One of the first Wirtgen W 200 Hi cold milling machines off the assembly line is now being used for road recyling work in southern Europe. The versatility of the machine due to its novel 400mm offset drum capability has proven extremely useful for the contractor in Italy. Tuscany–based Endi Asfalti is now using the large and highly productive W 200 Hi for a wide range of milling jobs that would previously have been carried out using a combination of large and small milling machines. The proven W 200 milling
  • Moscow overpass rebuild key to urban routes
    May 14, 2012
    Contractor Mostotrest has finished work on its US$114 million (€88.5 million) project to rebuild the Krestovsky overpasses over the Moscow and Oktyabrskaya railways at Prospect Mira, Moscow. The link is a vital one for Russian’s capital as it is one of the key urban routes linking the Yaroslavskoye Highway with the centre of Moscow. The company started work on the project in 2007 on the decision of the Moscow authorities for CJSC Administration of Capital Development, Utilities, Buildings and Roads (UKSIK
  • Australian bridge slides into position
    July 18, 2012
    A heavy rail crossing as part of Australia's EastLink motorway demanded great ingenuity and careful planning Most of the 88 bridges on the EastLink tolled motorway in, Melbourne, Australia were kept as simple and straightforward as possible. Contractor Thiess John Holland (TJH) developed its own precast yard 150km from the city, which provided many of the prefabricated materials required for the structures. This offered speed and economy while logistics and sequencing were vital for their erection. But the
  • Explosive demolition of US421 bridge over Ohio River
    September 23, 2013
    The fourth and final section of the Milton-Madison Bridge in the US has now been demolished. This aged 740m long structure was no longer able to cope with the traffic volumes along the route and has been demolished to make way for a new bridge. The bridge connects the US states of Indiana and Kentucky and has provided a key traffic route for the busy US421 over the Ohio River for many years. In a rather innovative piece of engineering, the new bridge has been constructed alongside the old structure and even