Skip to main content

VIDEO - Canadian contractor demolishing overpass

July 13, 2015
Canadian contractor Delsan has carried out a successful demolition of an overpass in Quebec. The firm used a number of John Deere excavators equipped with breakers and cutters to break up the overpass in a controlled demolition job. The structure was located in Sainte-Anne-de-Bellevue and needed to be removed as it had been made redundant.

Related Content

  • Video highlights efficiency of UK bridge demolition project
    March 31, 2014
    The demolition of the Belgrave Flyover in the UK city of Leicester was carried out efficiently and effectively, within the strict time and safety guidelines set by the client. This aged structure was no longer able to meet traffic demands in the city and was removed by the specialist contractor AR Demolition. Drone footage provided an aerial view of the operation. The contractor subsequently won a number of industry awards for several of its demolition operations. This video clip is shown courtesy of Digger
  • Doha’s massive ring road expressway project
    July 10, 2019
    The huge Doha ring road project will help decongest the city and improve transport for Qatar
  • Breaking at the face
    July 16, 2012
    Italian customer Marocca Group is using an Indeco HP18000 hydraulic breaker (the heaviest hydraulic breaker on the market at present) for primary demolition at a limestone quarry in Anagni, close to capital Rome. The 40ha quarry produces high grade limestone in 21 different sizes to meet an array of construction needs, and the bespoke fully automated crushing and screening plant is able to process over 500m³/hour of rock. By using the HP18000 in a primary winning application, Marocca Group has also been abl
  • Caterpillar pavers assist in Malta airport upgrade
    August 23, 2016
    A new Cat AP600F paver used by Maltese contractor Bonnici Brothers has helped with important resurfacing work at Malta’s International Airport. The machine was able to carry out the paving job within a tight time frame, due to its high productivity. The work was needed at the airport as part of a programme to increase its capacity. Malta is seeing growth in passenger numbers at the airport from both business travellers and tourists and there was a need to upgrade the facility. Local contractor Bonnic