Skip to main content

VIDEO - Canadian contractor demolishing overpass

July 13, 2015
Canadian contractor Delsan has carried out a successful demolition of an overpass in Quebec. The firm used a number of John Deere excavators equipped with breakers and cutters to break up the overpass in a controlled demolition job. The structure was located in Sainte-Anne-de-Bellevue and needed to be removed as it had been made redundant.

Related Content

  • Indeco boosts breaker range with mid-size model
    October 2, 2014
    Italian hydraulic breaker manufacturer Indeco is boosting its breaker range with the addition of a new model, the HP2750. This model features a 135mm diameter tool and weighs in at 1.69tonnes.
  • A new highway for northern Colombia
    July 17, 2023
    The Pamplona-Cúcuta highway is playing an important role for the development of northern Colombia
  • Connectivity is key for contractors
    November 8, 2022
    Michigan Department of Transportation (MDOT) has planned its US$210 million I-69 Rebuild Project in Eaton and Calhoun Counties, work that will improve journeys for drivers in the area
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of