Skip to main content

VIDEO - Canadian contractor demolishing overpass

July 13, 2015
Canadian contractor Delsan has carried out a successful demolition of an overpass in Quebec. The firm used a number of John Deere excavators equipped with breakers and cutters to break up the overpass in a controlled demolition job. The structure was located in Sainte-Anne-de-Bellevue and needed to be removed as it had been made redundant.

Related Content

  • France to complete cycling network by 2030
    March 28, 2023
    Around 510km were created last year to the national network in an effort to get even hesitant cyclist onto their bicycles as a means of getting to work and also getting out to play, in the city or the countryside.
  • Foran Equipment helps Kananaskis kayakers construct course
    April 27, 2016
    In the Canadian Rocky Mountains, there was a window of opportunity of only several days before these excavators had to be out of the Kananaskis River ahead of nearby Barrier Dam releasing its water. The provincial Alberta Whitewater Association hired local contractor Foran Equipment to bring in their equipment in to re-work the riverbed after severe flooding in June 2013 washed out the kayaking courses.
  • John Deere opts for Integrated emissions control
    January 6, 2017
    John Deere Power Systems, has completed its Stage IV engine line-up, now offering 2.9-litre, 4.5-litre, 6.8-litre and 13.5-litre engines with power outputs of 30kW to 448kW. The company is using three Integrated Emissions Control system configurations to meet the Stage IV/Tier 4 Final standard.
  • John Deere opts for Integrated emissions control
    April 22, 2015
    John Deere Power Systems, has completed its Stage IV engine line-up, now offering 2.9-litre, 4.5-litre, 6.8-litre and 13.5-litre engines with power outputs of 30kW to 448kW. The company is using three Integrated Emissions Control system configurations to meet the Stage IV/Tier 4 Final standard.