Skip to main content

VIDEO – California freeway bridge demolition in progress

July 20, 2015
A bridge demolition job is underway in California at present. The Carmenita Road Bridge, which crosses the Santa Ana Freeway, is being removed in stages. The work is being carried out at night when the I-5 route is closed to traffic, so as to minimise the impact for daytime peak traffic flow. The work is being carried out by a specialist contractor on behalf of 5246 Caltrans in the Santa Fe Springs area. The three week job is being closed overnight seven days a week between Rosecrans and Valley View avenues. The work forms part of the Carmenita Road Interchange project. The new Carmenita Bridge has been built and features four traffic lanes in either direction, compared with two lanes for the old bridge now being demolished.

For more information on companies in this article

Related Content

  • Kronprinsesse Marys Bro bridges Roskilde Fjord
    January 10, 2019
    A BESIX joint venture is giving the royal treatment to the new Kronprinsesse Marys Bro across Roskilde Fjord, writes David Arminas It was announced in September 2016 that Belgian group BESIX, in a joint venture (RBAI) with Italian firm Rizzani de Eccher and Spanish company Acciona Infraestructuras, had been chosen for the €133 million project. The award, by client Vejdirektoratet (Danish Road Directorate), marked the entry of BESIX into the Scandinavian market. Vejdirektoratet praised the winning bid as
  • Smarter paving for Berlin ring road
    December 13, 2018
    Germany’s capital Berlin is now benefiting from a newly widened ring road, which will help reduce peak time congestion Much of the work has been carried out by local contractor Johann Bunte Bauunternehmung, which has helped to widen the Berlin ring road from six to eight lanes. The firm has made extensive use of sophisticated paving controls also on its Vögele machines, the AutoSet Plus automatic functions. And the firm claims that these tools have made the work easier for the paving team to move between t
  • Bridge deck launched for the New Wear Crossing, Sunderland (Video)
    March 30, 2017

    The 300m bridge deck of Sunderland’s New Wear Crossing has been successfully launched across the river.

    The 4,750tonne concrete and steel deck was resting on the south side of the River Wear from where it was inched across to touch the north side in a 20-hour operation. It had to slide through the twin arched towers of the bridge’s double pylon on its way to its final position to connect the city regions of Pallion to the south and Castletown to the north.

  • VIDEO: Major bridge removal project for Boise, Idaho
    January 11, 2016
    A bridge demolition project is being carried out in Boise, the capital of US state Idaho.  Work is being carried out on the removal of the Broadway Avenue Bridge. The project also includes upgrades to the stretch of road that connects University Drive and Front Street in the city. A fleet of excavators fitted with demolition attachments is being used to remove the old structure and the new link will not be ready until the third quarter of 2016. Idaho Department of Transportation has set a series of diversions in place in the meantime.