Skip to main content

VIDEO – California freeway bridge demolition in progress

July 20, 2015
A bridge demolition job is underway in California at present. The Carmenita Road Bridge, which crosses the Santa Ana Freeway, is being removed in stages. The work is being carried out at night when the I-5 route is closed to traffic, so as to minimise the impact for daytime peak traffic flow. The work is being carried out by a specialist contractor on behalf of 5246 Caltrans in the Santa Fe Springs area. The three week job is being closed overnight seven days a week between Rosecrans and Valley View avenues. The work forms part of the Carmenita Road Interchange project. The new Carmenita Bridge has been built and features four traffic lanes in either direction, compared with two lanes for the old bridge now being demolished.

For more information on companies in this article

Related Content

  • $270 million Tanzania bridge opens
    July 2, 2025
    A $270 million bridge has opened in Tanzania.
  • Versatility for demolition and recycling
    July 31, 2012
    A growing demand for equipment to be used in recycling applications is helping boost the market for demolition attachments Manufacturers have been keen to invest in technology, developing new models and with more innovations to come. There are several key players in the hydraulic breaker sector, with Atlas Copco and Sandvik dominating this market segment. However other breaker manufacturers are major players too, including Indeco, Furukawa and NPK, while there are also specialist attachment producers such a
  • REBLOC barriers for Rheinbrücke Leverkusen
    July 26, 2024
    Construction of the vehicle restraint system for the new Rheinbrücke A1 Leverkusen (bridge) in Germany was a challenge, according to REBLOC, maker of the system.
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges