Skip to main content

VIDEO – California freeway bridge demolition in progress

July 20, 2015
A bridge demolition job is underway in California at present. The Carmenita Road Bridge, which crosses the Santa Ana Freeway, is being removed in stages. The work is being carried out at night when the I-5 route is closed to traffic, so as to minimise the impact for daytime peak traffic flow. The work is being carried out by a specialist contractor on behalf of 5246 Caltrans in the Santa Fe Springs area. The three week job is being closed overnight seven days a week between Rosecrans and Valley View avenues. The work forms part of the Carmenita Road Interchange project. The new Carmenita Bridge has been built and features four traffic lanes in either direction, compared with two lanes for the old bridge now being demolished.

For more information on companies in this article

Related Content

  • Vietnam’s US$1.6 billion key road projects
    October 7, 2024
    Vietnam is investing US$1.6 billion for four key road projects.
  • A new highway for northern Colombia
    July 17, 2023
    The Pamplona-Cúcuta highway is playing an important role for the development of northern Colombia
  • Formwork plays a leading role in global infrastructure projects
    June 13, 2012
    New and highly regarded existing formwork systems have been used in major recent transport-related construction projects across the globe. Guy Woodford looks at some of their applications The multi-million dollar Mississippi River Bridge project in the United State is creating a vital new gateway between Illinois and Missouri. Central to the project is the realignment and reconstruction of Interstate 70 and a new landmark bridge, featuring two pylons projecting vertically from the Mississippi river bed w
  • HA dismantles footbridge over M5 in England
    January 3, 2013
    Contractors worked solidly throughout the night during one Saturday and early Sunday morning in November (2012) to dismantle the Pegwell Brake footbridge over the M5 near Bristol, south west England. The concrete footbridge, located between junctions 16 and 17, needed to be demolished to make way for a new steel pedestrian bridge suitable for high-sided vehicles to pass under when the managed motorway is fully operational and the hard shoulder is used as a running lane. The dismantling and removal of the