Skip to main content

VIDEO – California freeway bridge demolition in progress

July 20, 2015
A bridge demolition job is underway in California at present. The Carmenita Road Bridge, which crosses the Santa Ana Freeway, is being removed in stages. The work is being carried out at night when the I-5 route is closed to traffic, so as to minimise the impact for daytime peak traffic flow. The work is being carried out by a specialist contractor on behalf of 5246 Caltrans in the Santa Fe Springs area. The three week job is being closed overnight seven days a week between Rosecrans and Valley View avenues. The work forms part of the Carmenita Road Interchange project. The new Carmenita Bridge has been built and features four traffic lanes in either direction, compared with two lanes for the old bridge now being demolished.

For more information on companies in this article

Related Content

  • Mobile grouting trailers for soil nail rigs
    February 7, 2012
    Geotechnical specialists, Bachy Soletanche and Carillion Piling are currently working on an £18 million (e21 million) geotechnical contract as part of carriageway improvements on the M1 motorway to the north of London, England. The work between junctions 10-13, Luton to Milton Keynes, is being carried out for the Costain Carillion joint venture working on behalf of the Highways Agency. The piling and soil nailing works are to facilitate the conversion of the current hard shoulder to a peak-time running lane
  • Ontario’s Highway 413 revisited
    June 27, 2025
    Final property acquisitions are taking place for construction of Highway 413 in the Canadian province of Ontario to start later this year.
  • Support for underground tunneling work
    May 11, 2015
    The Brenner Base Tunnel is a key transport link and the use of the latest technology for support works has been played an important role. Work on the tubes of the Brenner Base Tunnel, one of the largest underground infrastructure projects underway at present, is seeing the use of sophisticated equipment. Excavation of the new Tulfes-Pfons section commenced in the third quarter of 2014 and the route will form part of the TEN Axis connection between Helsinki to Valletta. The new section, worth around €
  • LagoonHull still on the cards
    February 7, 2022
    A proposed major river development in Hull would include an immersed road tunnel to connect traffic arriving from Europe with the UK’s motorway network.