Skip to main content

VIDEO – California freeway bridge demolition in progress

July 20, 2015
A bridge demolition job is underway in California at present. The Carmenita Road Bridge, which crosses the Santa Ana Freeway, is being removed in stages. The work is being carried out at night when the I-5 route is closed to traffic, so as to minimise the impact for daytime peak traffic flow. The work is being carried out by a specialist contractor on behalf of 5246 Caltrans in the Santa Fe Springs area. The three week job is being closed overnight seven days a week between Rosecrans and Valley View avenues. The work forms part of the Carmenita Road Interchange project. The new Carmenita Bridge has been built and features four traffic lanes in either direction, compared with two lanes for the old bridge now being demolished.

For more information on companies in this article

Related Content

  • Maybe Hire takes on Whorlton Bridge
    March 14, 2025
    For refurbishment of the old English bridge, a temporary cable crane structure - designed by CaSE Civil & Structural Engineering - used a range of Mabey Hire’s propping equipment, including the Mass 50, System 160 and Mat 125 products.
  • Novel dual layer paving work in Germany
    February 2, 2017
    A German contractor is now using two novel asphalt paving technologies from Vögele together for key projects The firm has acquired Vögele’s InLine Pave equipment with its innovative dual layer paving technology as well as one of the SUPER 1800-3i SprayJets for paving a surface course. This combination of technologies is allowing contractor Rask Brandenburg to carry out fast and efficient road rehabilitation work on some major routes, including a busy Autobahn stretch leading into capital Berlin. T
  • Fast resurfacing work in UK by contractor Eurovia
    May 15, 2017
    In the UK the contractor Eurovia has recently carried out a challenging resurfacing job within a tight timescale. The firm had to contend with live traffic on a busy stretch of motorway, while carrying out the work close to shared intersections. The traffic was particularly heavy also during part of the job due to a holiday period and large numbers of tourist vehicles using the stretch of motorway.
  • Scotland’s Queensferry Crossing opens to traffic
    August 30, 2017
    The new Queensferry Crossing in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the ch