Skip to main content

VIDEO – California freeway bridge demolition in progress

July 20, 2015
A bridge demolition job is underway in California at present. The Carmenita Road Bridge, which crosses the Santa Ana Freeway, is being removed in stages. The work is being carried out at night when the I-5 route is closed to traffic, so as to minimise the impact for daytime peak traffic flow. The work is being carried out by a specialist contractor on behalf of 5246 Caltrans in the Santa Fe Springs area. The three week job is being closed overnight seven days a week between Rosecrans and Valley View avenues. The work forms part of the Carmenita Road Interchange project. The new Carmenita Bridge has been built and features four traffic lanes in either direction, compared with two lanes for the old bridge now being demolished.

For more information on companies in this article

Related Content

  • Protest storm over new US$0.5bn Nevada highway
    August 20, 2012
    The most expensive highway ever built in Nevada will open before the end of August to a storm of protest. The new 13.7km Interstate 580 three-lane motorway, which is reported to have cost more than US $0.5 billion to construct, has been dubbed a vanity project by local politicians.
  • US$151 million bridge deal for Ferrovial in Puerto Rico
    April 16, 2024
    Ferrovial has won a US$151 million bridge deal in Puerto Rico.
  • Kathmandu's road widening project to ease congestion
    May 11, 2012
    The authorities in Nepal’s capital Kathmandu are working on widening the Kathmandu Valley road, a key project that has already seen the demolition of many structures along its boundary. The take-up of land has been eased by The Road Act, Nepal, which secures the roadside area of 25m on either side of the road on the National Highway.
  • Meeting the challenge of desert runway resurfacing
    February 8, 2012
    Ferocious daytime temperatures can provide a tough challenge to construction firms working in desert conditions in Egypt's south. Despite the high daytime temperatures however, Egyptian contractor Orascom has managed to complete an airport project on budget and ahead of schedule, while meeting the client's tight specifications.