Skip to main content

VIDEO: Bridge demolition on key A90 route in Scotland

November 4, 2015
Demolition work has been carried out on a bridge crossing the busy A90 route in Scotland, just to the north of the capital, Edinburgh. The bridge carried the B900 over the A90 but had to be removed as its narrow design prevented the route from being upgraded to full motorway status. The first stage of the demolition work was carried out on October 24th and 25th, with the second stage on October 31st and November 1st and final remedial work to be carried out on November 14th and 15th. The first stage of the demolition required the temporary closure of the A90 in a weekend possession, with any traffic being switched temporarily to the Kincardine Bridge some distance upstream. Geotextiles and wood panels were laid on the surface of the A90 to protect the asphalt from damage as the work was carried out. A number of excavators equipped with hydraulic breakers were used to tear down the old bridge structure, with the concrete rubble and steel reinforcement then being loaded into trucks and hauled away for recycling. The second stage of the bridge demolition involved similar measures to protect the roadway, as will the third.

Traffic on the B900 at South Queensferry had already been switched over to a new, wider bridge. The work is part of a series of upgrades to roads in the area being carried out along with the construction of the new Queensferry Crossing. This spans the Forth Estuary and will carry the major portion of traffic currently using the Forth Road Bridge, which opened in 1964.

A full report on the Queensferry Crossing will be included in the November/December 2015 issue of World Highways.

Related Content

  • Italian viaduct job for Conjet
    July 4, 2012
    The multi-span reinforced concrete viaduct at Torano, about 100km east of the Italian capital Rome, is a major structure on the main E80/A24/A25 Autostrada crossing central Italy. The Viadotto Fiume Salto was opened in the late 1960s, but the use of de-icing salts during winter months has since caused considerable calcium chloride damage to the structure forcing the Italian Highways Authority and the Autostrada di Parchi's owner Toto to carry out extensive repairs. The renovation estimated at around €5 mill
  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public
  • Amey wins Forth Bridge deal
    December 2, 2014
    Amey will handle the contract to manage and maintain the existing Forth Road Bridge and the new Queensferry Crossing. The latter is currently under construction. The contract will commence on the 1st June 2015 and Amey will then take over responsibility for the Forth Road Bridge, which opened to traffic in 1964. The Queensferry Crossing is due to open to traffic in 2016.
  • Urgent repairs to Forth Rd bridge
    March 19, 2012
    Urgent repairs will continue on the Forth Road Bridge in east central Scotland this weekend after work the previous weekend was disrupted by strong winds. The bridge authority has also confirmed that a further three weekends of traffic restrictions will be required over the following weeks. On Saturday 17 and Sunday 18 March traffic will be restricted to a single lane in each direction from 3am until 12noon.