Skip to main content

VIDEO: Bridge demolition jobs in CA

November 23, 2015
Explosive demolition techniques were used to remove a bridge structure in the US at the weekend. In California on the west coast, the removal of a pier from the old Bay Bridge structure was carried out. The explosive demolition was organised by 5246 Caltrans, with around 10tonnes of explosives being used to blast the redundant bridge pier. Protective layers of wood and steel were used to prevent debris from the massive 24.4m x 42.7m bridge pier from being thrown into the air. Meanwhile a special bubble curtain was also used around the pier to minimise the effects of the blast on wildlife in the surrounding area. Although water was thrown over 30m into the air by the blast, the mat prevented and debris.

For more information on companies in this article

Related Content

  • Explosive demolition of US421 bridge over Ohio River
    September 23, 2013
    The fourth and final section of the Milton-Madison Bridge in the US has now been demolished. This aged 740m long structure was no longer able to cope with the traffic volumes along the route and has been demolished to make way for a new bridge. The bridge connects the US states of Indiana and Kentucky and has provided a key traffic route for the busy US421 over the Ohio River for many years. In a rather innovative piece of engineering, the new bridge has been constructed alongside the old structure and even
  • UK motorway bridge work
    June 10, 2025
    A new bridge now spans the UK’s busy M6 motorway.
  • Flyover removal completed successfully
    May 14, 2021
    The removal of a flyover in Perry Barr, Birmingham, has now been completed in the UK. The work was carried out successfully by the contractor Tarmac within a tight timeframe
  • Historic Oakland Bay Bridge receives a new asphalt road surface
    March 31, 2014
    Part of an iconic US bridge has been given a new lease of life, as Mike Woof reports The western section of the historic Oakland Bay Bridge in the US state of California has recently benefited from a series of improvements to strengthen its structural integrity and also upgrade the running surface. Contractor OC Jones & Sons of Berkeley CA, paved large portions of the bridge, taking on two different projects as part of the work. First was placement of the specialised epoxy on the self-anchored suspension (S