Skip to main content

VIDEO: bridge demolition job in China

September 10, 2015
Explosive demolition techniques were used to remove a defunct bridge in China. The Lishui Bridge in Zhangjiajie, central China was around 40 years old and was no longer able to meet current traffic requirements. The local authorities hired in a demolition contractor to remove the structure, with explosives then being used to bring it crashing down earlier this week. The Big People’s Daily Online reported that 1tonne of explosives was used for the work.

Related Content

  • Germany to cut red tape for bridge construction up to 2027
    October 5, 2017
    The German federal government has set aside €4.5 billion for refurbishment of 400 bridges in the state of North Rhine-Westphalia up to 2027. Hendrik Wüst, North Rhine-Westphalia transport minister, made the announcement which included around €200 million for road maintenance. The Federal German government also plans to fast-track planning for infrastructure projects. Bonuses to contractors for improved performance to reduce down-time on construction sites as well as the possibily of a six-day working
  • Market confidence remains strong in the build-up to bauma China 2012
    May 18, 2012
    Despite a slight slow-down in the pace of economic growth in China, market confidence remains strong in the country. The organisers of the upcoming bauma China event, from November 27 to 30 2012, say that China is still a key market for the global construction sector. Supported by a booming domestic market, the Chinese construction machinery manufacturers are also making ground on the international front. The exhibition is an international trade fair for construction machinery, building material machines, c
  • Mini-bridge aids Forth repairs
    July 17, 2012
    An engineering "first" means that rehabilitation work on a vital Scottish bridge built over 40 years ago can be carried out smoothly A new report to the Forth Estuary Transport Authority (FETA) in Scotland recommends appointing Balfour Beatty Civil Engineering of Edinburgh as 'preferred bidder' to carry out the scheduled replacement of the bridge's main expansion joints in 2009. However, the report to the bridge authority says the tender price of £13.7 million (US$21.3 million) is some £5 million ($7.8 mill
  • Long reach equipment simplifies demolition
    February 14, 2012
    Demolition is a highly specialised business, as the machinery required to carry out the work on high-rise demolition contracts can be very site specific. Today's high reach demolition rig is no longer simply a tracked excavator with a long boom, indeed some machines cannot be used as excavators at all. Likewise a machine that is dedicated to carrying a 2.5 or 3tonne shear or hammer will need to be built to take the stresses and strains of demolition life.