Skip to main content

VIDEO: bridge demolition job in China

September 10, 2015
Explosive demolition techniques were used to remove a defunct bridge in China. The Lishui Bridge in Zhangjiajie, central China was around 40 years old and was no longer able to meet current traffic requirements. The local authorities hired in a demolition contractor to remove the structure, with explosives then being used to bring it crashing down earlier this week. The Big People’s Daily Online reported that 1tonne of explosives was used for the work.

Related Content

  • VIDEO: Successful explosive bridge demolition in Kentucky
    July 28, 2016
    A successful explosive bridge demolition job has been carried out in the US State of Kentucky. After a short delay, demolition specialists managed to remove the old Eggners Ferry Bridge successfully and without incident. The explosives broke up the four middle spans of the structure. The demolition job was not without its challenges, with concern over the presence of nesting ospreys on the structure. Demolition personnel had to keep a distance of 90m from the nesting area, which delayed preparations.
  • Explosive demolition works for US Bridge
    January 19, 2015
    A successful explosive demolition project for an old bridge has been carried out in the US state of Missouri. The Fairfax Bridge was constructed in 1935 and was no longer able to meet current transportation needs. Some 760m long the bridge was carrying around 6,000 vehicles/day. Another bridge was also opened nearby, the Platte Purchase Bridge, in 1957 to help the original structure carry the necessary traffic volumes. Removing the old structure of the Fairfax Bridge as well as the Platte Purchase Bridge and replacing them with a new bridge is costing around US$79 million.
  • VIDEO – Explosive blast apart redundant US bridge
    July 13, 2015
    The Donora-Webster Bridge over the Monongahela River in the US has been demolished using explosives. The ageing structure spanned the Monongahela River, connecting Washington and Westmoreland Counties in Pennsylvania. The bridge was built in 1908 and originally carried a rail link but in 1938 the tracks were removed and the structure was modified so that it could handle motor vehicle traffic instead. The Donora-Webster Bridge linked Route 837 on the west side of the Monongahela River with Route 906 on the east bank.
  • Efficient bridge demolition in China
    March 31, 2014
    A contractor in China has completed an effective bridge demolition job efficiently and quickly. The pre-weakened structure was brought crashing into the river it spanned following one final push using the boom of an excavator. The defunct bridge collapsed in a controlled fashion without injury or inconvenience, allowing the rubble to be removed in a subsequent operation.