Skip to main content

VIDEO - Bridge demolition going wrong

June 17, 2015
A bridge demolition job went spectacularly wrong in Finland recently. Luckily for all concerned, there were no casualties, but it could have quite easily been a different story. A demolition contractor was using an excavator fitted with a hydraulic breaker to break up the structure, but the work was carrying on despite live traffic flowing on the road under the bridge.

Note too the behaviour of drivers on the route after the initial collapse.

This video came just as the European Demolition Association headed to Finland’s capital Helsinki to discuss best practice.

The Viitostiellä Mikkelissä bridge collapsed following a few blows from a hydraulic hammer to the deck, suggesting the structure was in a very poor condition indeed.

Related Content

  • Right ways to deter wrong-way
    November 11, 2020
    After a pilot programme, California’s Caltrans is reviewing its highway design standards
  • Wrong time to end right turns?
    March 15, 2024
    Banning right-hand turns after stopping for a red light is gaining momentum in the US. But debate continues about whether it will result in fewer incidents between vehicles and alternative mobility users. David Arminas reports.
  • Engineering elegance in bridge design
    July 9, 2012
    Multi-award-winning bridge designer Michel Virlogeux was the keynote speaker at the recent Austroads Bridge conference, held in Auckland, New Zealand, last month. He had a simple message: Bridge design is the realm of the engineer and should not be given to architects. "Bridge architecture, bridge aesthetics, bridge elegance is the problem of engineers. We must not leave this major part of our job to architects," he said. "I always work with an architect, but the architect is not selecting the structure. To
  • VIDEO – Explosive blast apart redundant US bridge
    July 13, 2015
    The Donora-Webster Bridge over the Monongahela River in the US has been demolished using explosives. The ageing structure spanned the Monongahela River, connecting Washington and Westmoreland Counties in Pennsylvania. The bridge was built in 1908 and originally carried a rail link but in 1938 the tracks were removed and the structure was modified so that it could handle motor vehicle traffic instead. The Donora-Webster Bridge linked Route 837 on the west side of the Monongahela River with Route 906 on the east bank.